Download USER MANUAL - Vauconsant

Transcript
USER MANUAL
Refrigeration connection
Installation of the condensation generator
The condensation generator should be positioned facing the ventilation grid provided which is the
same format as the condenser.
It is imperative to position the condenser as close as possible (1 cm) to the ventilation grid.
1 cm
Connect the refrigerating circuit, following the refrigeration diagram.
•
Option with condensation generator supplied
Tightening of self drilling connections
Tightening of connections with protective cap
1.
2.
3.
4.
5.
Manually tighten both ½ female and male connections with protective cap
Use two flat 27/33 spanners to strike the ½ protective caps
Continue to tighten to obtain the tightness (2 cycles of tightening force )
Test tightness with soapy water or a leak detector
Repeat the operation with both ¼ female and male connections with protective cap
(identified with red tape) using 21/19 flat spanners.
Before tightening
After tightening
Vauconsant SA, all rights reserved A370xx & A373xx -rev0-FR, 18th November 2009
-5-