CHAPTER 3. PROJECT DESCRIPTION 61 (starting on March 12th and ending in May 25th). Additionally, two extra months are considered for non-development tasks, such as research on the state-of-the-art and requirements elicitation and specification; thus considering a total project time of four months and two weeks. mar 2012 Id. Task Start End 11/3 1 Iteration 1 12/03/2012 20/04/2012 30d 2 Planning 12/03/2012 12/03/2012 1d 3 Analysis 13/03/2012 14/03/2012 2d 4 Design 15/03/2012 16/03/2012 2d 5 Development 19/03/2012 16/04/2012 21d 6 Testing 17/04/2012 19/04/2012 3d 7 Documentation 20/04/2012 20/04/2012 1d 23/04/2012 09/05/2012 13d 8 Iteration 2 9 Planning 23/04/2012 23/04/2012 1d 10 Analysis 24/04/2012 24/04/2012 1d 11 Design 25/04/2012 26/04/2012 2d 12 Development 27/04/2012 04/05/2012 6d 13 Testing 07/05/2012 08/05/2012 2d 14 Documentation 09/05/2012 09/05/2012 1d 10/05/2012 25/05/2012 12d 15 Iteration 3 apr 2012 may 2012 Duration 16 Planning 10/05/2012 10/05/2012 1d 17 Analysis 11/05/2012 11/05/2012 1d 18 Design 14/05/2012 15/05/2012 2d 19 Development 16/05/2012 22/05/2012 5d 20 Testing 23/05/2012 24/05/2012 2d 21 Documentation 25/05/2012 25/05/2012 1d 18/3 25/3 1/4 8/4 15/4 22/4 29/4 6/5 13/5 20/5 27/5 Figure 3.3: Temporal planning for the development (Gantt chart) 3.7.2 Costs Projection The costs projection for this project are detailed in this section. Table 3.62 shows the detailed estimated costs for physical resources. Regarding the technological resources, computer servers are considered to have an average lifetime of 5 years (depreciation of 20% per year), while for personal computers the average lifetime are 2 years (depreciation of 50% per year); and none of them are considered to have any residual value when their lifetime expires.