Download installation and servicing
Transcript
SERVICING 67 Pressure Relief Valve Renewal 1. Refer to Frames 45 & 46. 2. Refer to Frame 53. 3. Close the isolating service valves and drain the (CH) boiler. Refer to Frame 65. 5 4. Remove the burner & Fan assembly. Refer to Frame 52. 5. Remove the CH Water Pressure Sensor. Refer to Frame 70. 6. Undo the PRV outlet retaining nut. (retaining the washer) 7. Remove the securing clip at the rear of the valve body. Servicing 8. Withdraw the valve vertically. 9. Renew the valve and refit in reverse order. 10.Refill the CH system. Refer to Frame 65. 11.Check the operation of the boiler. Refer to Frames 32-35. 6 68 Pump Auto Air Vent Replacement 1. Refer to Frames 45 & 46. 2. Refer to Frame 53. 3. Close the isolating service valves and drain the (CH) boiler. Refer to Frame 65. 4. Remove the burner & Fan assembly. Refer to Frame 52. 5. Remove return pipe connected at top of pump and heat exchanger. 6. The auto air vent is retained in the pump body with a bayonet connection. The air vent and float assembly is removed by turning the head anti-clockwise (viewed from above) and pulling upwards. 5 7. Reassemble in reverse order. 8. Ensure the air vent head o ring seal is in place when refitting and the seal is in place at the pump outlet connection. 9. Refill the CH system. Refer to Frame 65. 10.Loosen the cap of the air vent. 11.Check the operation of the boiler. Refer to Frames 32-35. 54 vogue system boiler - Installation and Servicing