Figure 7: Functional Test for activPAL3M Stage 1: Setup recording Stage 2: Check Data Standard Operation Protocol START Step 1 Step 8 Insert activPAL to docking station and download data Insert activPAL to docking station and charge for 3 hours NO NO Step 2 GREEN light on ORANGE light off Is the time of the activPAL correct? Step 9 FAIL FAIL YES YES NO Step 3 Battery level > 189 FAIL NO Step 10 YES Start and duration of recording correct? FAIL NO Serial number correctly displayed Step 4 FAIL YES YES Step 5 Setup recording for immediate start or midnight with 1 calendar day minimum duration Step 6 Around mid-day of recording change orientation to upright orientation (vertical) Step 7 Remove activPAL and place in a sedentary Step 11 Is the timing of the posture change correct? YES 21 TEST PASSED NO FAIL