Download Installation Instructions Secondary Transformer 3-Barrel
Transcript
3-Barrel Secondary Transformer Installation Instructions INSTALLATION INSTRUCTIONS SECONDARY TRANSFORMER 3-BARREL SERVICE KIT CORNELIUS P/N 620710737S ! WARNING: Disconnect power to the unit before servicing. Follow all lock out/tag out procedures established by the user. Verify all power is off to the unit before performing any work. Failure to comply could result in serious injury, death or damage to the equipment. ! CAUTION: Before replacing the Secondary Transformer on a Viper unit be sure to read and understand all safety labels, and safety warnings on the machine and safety warnings in owners and service manuals. Tools Required: Phillips screw driver - Needle-nose pliers - 5/16” Nut driver Perform the following procedure: 1. Open the electrical box, and locate the secondary transformer (shown in Figure 1). It is located in the upper left hand corner of the electrical box. Secondary Transformer Figure 1. Secondary Transformer 2. Remove the blue lead, brown lead, and two (2) yellow leads from transformer to be replaced (see Figure 2). Blue Yellow Brown Figure 2. Transformer Lead Colors 3. Remove the transformer from the electrical box. by removing the two (2) 8-32 screws. 4. If the electrical box has only two (2) mounting holes as shown in Figure 3, than use the mounting bracket provided in the kit. Revision Date: April 28, 2014 © 2011-2014, Cornelius Inc. www.cornelius.com -1- Revision: B Publication Number: 620710737SINS 3-Barrel Secondary Transformer Installation Instructions 2 Mounting Holes Figure 3. Transformer Mounting Holes 5. If the electrical box has four (4) mounting holes (see Figure 4), than mount the new transformer directly to the electrical box. 4 Mounting Holes Figure 4. Transformer Mounting Holes 6. Mount the new transformer with the four (4) terminals (two terminals with black caps) toward the right hand side, as shown in Figure 5. Figure 5. Transformer Terminals Publication Number: 620710737SINS -2- © 2011-2014, Cornelius Inc. 3-Barrel Secondary Transformer Installation Instructions 7. Connect the yellow lead to the left hand terminal on the transformer. Connect the blue and brown leads to the right terminals of the transformer, as shown in Figure 6. Yellow Leads Blue Lead Brown Lead Figure 6. Transformer Lead Location 8. Close electrical box, and return the unit to normal operation. Be sure to follow all owners and service manual instructions in starting the unit. © 2011-2014, Cornelius Inc. -3- Publication Number: 620710737SINS