Download D2064-1TR8 - Cessna Support
Transcript
CESSNA AIRCRAFT COMPANY MODEL 152 SERIES SERVICE MANUAL INSPECTION TIME LIMITS 1. Inspection Items REVISION STATUS TASK INTERVAL OPERATION ZONE Inspect aircraft records to verify that all applicable Cessna Service information Letters, Cessna Service Bulletins and Supplier Service Bulletins are complied with. Every 100 hours or 12 months 1 - Inspect aircraft records to verify that all applicable Airworthiness Directives and Federal Aviation regulations are complied with. Every 100 hours or 12 months 1 - Inspect aircraft records to verify that all logbook entries required by the Federal Aviation Regulations are complied with. Every 100 hours or 12 months 1 - Inspect aircraft records to verify that all SID Inspections have been complied with as scheduled. Every 100 hours or 12 months 1 - Inspect rudder pedal torque tube, shafts, support brackets and cable attachment arms. Refer to 2A-14-01, Supplemental Inspection Document 27-20-01, for inspection procedure. Initial: 10,000 hours 7 or 20 years; repeat: 3,000 hours or 5 years 211 Elevator trim system. 1. Inspect elevator trim brackets and actuator support brackets. 2. Inspect pulleys, attaching structure and fasteners. Refer to Section 2A14-02, Supplemental Inspection Document 27-30-01, for inspection procedures. Initial: 1,000 hours; 14 repeat: 1,000 hours 330, 340 This inspection is for mild/moderate corrosion Inspect main landing gear tubular environment. spring for rust or damage to finish. Inspect entry step attachment. Refer to Section 2A-14-03, Supplemental Inspection Document 32-13-01, for inspection procedure. Initial: 20 years; 11 repeat: 10 years 730, 740 This interval is for severe corrosion environment. Inspect main landing gear tubular spring for rust or damage to finish. Inspect entry step attachment. Refer to Section 2A-14-03, Supplemental Inspection Document 32-13-01, for inspection procedure. 10 years; 13 Initial: repeat: 5 years 730, 740 Inspect main landing gear fittings and attachment of the fittings to the bulkheads. Refer to Section 2A-14-04, Supplemental Inspection Document 32-13-02, for inspection procedure. Initial: 3,000 hours or 5 years; repeat: 1,000 hours or 5 years 15 210 Inspect nose landing gear torque links, bolts, bushings and fork. Refer to Section 2A-14-05, Supplemental Inspection Document 32-20-01, for inspection procedure. Initial: 3,000 hours 8 or 5 years; repeat: 3,000 hours or 5 years D2064-1-13 Temporary Revision Number 8 - May 18/2015 © Cessna Aircraft Company 720 2A-10-01 Page 1 Oct 2/1995