Download Installation, Operation, and Service Manual

Transcript
26 Additional Mainbar Tests and Configurations
Table 3.5: ALLEY and TAKEDOWN LED positions and controller switches
RS242 Mainbar
ALLEY Positions
RS252 Mainbar
ALLEY Positions
Mainbar Controller
SW3 Switch
1, 2
1, 2
DVR
15, 16
17, 18
PASS
RS242 Mainbar
TAKEDOWN Positions
RS252 Mainbar
TAKEDOWN Positions
Mainbar Controller
SW2/SW4 Switch
7
7
DFB
8
8
DFA
9
11
PFD
10
12
PFC
LF
4
5
6
DFB
7
FRONT
DFA PFD
8
9
PFC
10
11
RF
13
12
3
14
2
15
MODEL RS242
1
16
17
30
29
27
28
LR
26
WORK WORK WORK WORK
LIGHT LIGHT LIGHT LIGHT
25
24
23
22
18
21
20
19
RR
FRONT
LF
4
3
5
6
DFB
7
DFA
8
9
10
PFD
11
PFC
12
13
14
RF
15
16
2
17
MODEL RS252
1
18
34
19
33
LR
32
31
30
WORK WORK
LIGHT LIGHT
29
28
27
26
WORK WORK
LIGHT LIGHT
25
24
20
23
22
21
RR
NOTE: THE TYPICAL HOTFOOT CONFIGURATION HAS THE TAKEDOWN LIGHTS
IN THE FRONT (LF, RF) AND THE ALLEY LIGHTS IN THE REAR (LR, RR)
290A5888B
3
Preparing the RAYDIAN S2
for Installation
Figure 3.6: ALLEY and TAKEDOWN LED positions on the mainbar
Testing the LEFT and RIGHT ALLEY Lights
1. Apply 12 Vdc (+BAT) to the control wire for either the LEFT or RIGHT
ALLEY LED (Table 3.1 on page 16). The LEFT or RIGHT alley lights turn on
in both the mainbar and HOTFOOT, if equipped.
2. Remove 12 Vdc from the control wire.
3. Repeat steps 1 and 2 for the other alley lights.
Testing the TAKEDOWN Lights
!PPLY6DC"!4TOTHEWHITEBLACKCONTROLWIREFORTHE4!+%$/7.LIGHTS
The TAKEDOWN lights turn on in both the mainbar and HOTFOOT, if equipped.