Download Quality Control Procedures Applied to Nuclear
Transcript
6. PEAK SHIFT VERSUS COUNT RATE Peak shift versus count rate appears to the user as equal to count rate non-linearity but electronically this is due to a poor baseline restoration. Therefore, this feature also has to be tested so that one knows about the behaviour of the base line restoration. Test description: In this set of measurements one has to monitor the peak position and peak shape. The pulse generator was set to the random mode and in the SCA system the LLD was set to a fixed level. When the counter starts counting, the dial setting for pulse amplitude of the random pulse generator has to be monitored by the dial setting for each count rate. The test set-up is presented below. Fig. 6. Set up for peak shift versus count rate measurement. TABLE 8. PEAK SHIFT VERSUS COUNT RATE. Count rate Dial setting of pulse Deviation Dial setting of pulse generator when system generator when NIM test under test starts counting electronics starts counting Deviation 200 cps 500 cps 1 kcps 2 kcps 10 kcps 7. CHI SQUARE TEST This test is an overall QC test and gives an indication of the proper operation of the counting system when applying random pulses from a radioactive source. In a set of 10 measurements 50