Download Selecting Infrared Heaters
Transcript
0720_HPAC_MOMF.qxd 2/18/05 1:53 PM Page 57 DESIGN E Q U I P M E N T N O T E B O O K Installing Infrared Heaters COMMISSIONING OPERATION & MAINTENANCE INSTALLATION Proper installation guarantees safe and comfortable use CAM MARKLOWITZ MJM Associates Inc. Englewood, Colo. explosive or flammaGas supply line ble fumes, especially ast month, the sizing and selec- those where chloriManual gastion of commercial, gas-fired in- nated, halogenated, or shutoff valve Ground joint union frared units was discussed. An- acidic vapors are preswith brass seat other key factor in determining the ent. Gas correct type and size of a unit for an appli• Manufacturer re- supply line cation is to examine how the unit will be quirements for clearTo controls installed. Proper installation is at least as ance to combustibles Plugged 1/8-in. NPT 3-in. min. important as sizing and selecting the type and recommended test gauge connection of infrared unit heater to be used in an ap- mounting heights plication. must be adhered to Sediment trap A number of general infrared installa- strictly. tion requirements are common to all • Installations must commercial, gas-fired equipment: conform not only to FIGURE 2.2 A ground joint union and manual shutoff valve • The installation work must be done local and national should be installed in the gas supply line adjacent to the unit. by a qualified installation agency. building codes, but • Gas-fired equipment should never be also to the requirements of the manufac- intensity infrared units reach temperainstalled in areas exposed to potentially turer described in the installation and tures in excess of 1,700o F, while low-intensity units can produce tube temperaservice manual. Photos courtesy of Modine Manufacturing When equipment is selected tures in excess of 1,000 o F near the for a job, the sizing and selection burner. As a result of these high temperaprocess should produce a plan tures, clearances to combustibles must be drawing that shows where each strictly adhered to. Be aware of clearances Minimum clearance to unit will be located in the build- to the following: combustible materials • Combustible materials. ing. Make sure this plan drawing • Stacked materials (signs are to be is available before installing the Mount posted in locations with stacked materials equipment. height No matter how neat and clean to indicate the maximum permissible the installation, if the installation stacking height (Figure 2.1). Stacking • Lights. does not comply with a properly height • Sprinkler heads. designed plan, there will be heat • Overhead cranes. related complaints from the • Objects on lifts (like automobiles inbuilding occupants. The plans should include location, mount- side repair shops). Infrared units, like all gas-fired equiping height, and angle of reflecFIGURE 2.1 Post maximum stacking heights below ment, need clean combustion air to opertors. infrared heaters. Next, determine if the sup- ate. High-intensity units and unvented porting structure is adequate to low-intensity units require a minimum support the unit and ensure the required air displacement of 4 cfm per 1,000-Btuh Cam Marklowitz is the vice president of electric and gas utilities are available. For input for natural gas and 5 cfm per sales for MJM Associates Inc. in Englevented applications, the unit must be lo- 1,000-Btuh input for propane gas. Not wood, Colo., which represents 15 manucated so it is vented per the requirements all low-intensity installations can be unfacturers in the HVAC industry, offering vented. Check the installation-and-servin the installation and service manual. sales support, product training, applicaOperating temperature is also a factor ice manual provided by the manufaction assistance, and technical support to that must be considered. High and low- turer. Ventilation and combustion-air wholesale distributors, OEMs, engineers, intensity infrared units operate at high requirements for both vented and unand contractors. temperatures. The ceramic tiles in high- vented applications must be adhered to. L 2