Download Service Instructions
Transcript
SPECIFICATIONS
MODEL
GMTH-A/B
GMTH045-3A/B GMTH070-3A/B GMTH090-5A/B
Btuh Input (US) Natural Gas
45,000
70,000
90,000
Output (US) Natural Gas
36,000
56,000
72,000
Btuh Input (US) LP Gas
40,000
60,000
80,000
Output (US) LP Gas
32,000
48,000
64,000
80%
80%
80%
Rated External Static (" w.c.)
.10 - .50
.10 - .50
.10 - .50
Temperature Rise (°F)
15 - 45
20 - 50
35 - 65
-0.60
-0.60
-0.70
10 X 6
10 X 8
11 X 10
1/3
3/4
3/4
4
3
3
1499
1773
2134
115-60-1
115-60-1
115-60-1
Minimum Circuit Ampacity (MCA)
12.5
11.8
11.8
Maximum Overcurrent Device
15.0
15.0
15.0
Transformer (VA)
40
40
40
Primary Limit Setting (°F)
230
240
240
Auxiliary Limit Setting (°F)
120
120
120
Rollout Limit Setting (°F)
300
300
300
30 secs.
30 secs.
30 secs.
150 secs.
150 secs.
150 secs.
5 secs.
5 secs.
5 secs.
Off Cooling
60 secs.
60 secs.
60 secs.
Fan Delay On - Fan Only
5 secs.
5 secs.
5 secs.
7 / 11
7 / 11
7 / 11
3.5 / 10
3.5 /10
3.5 /10
#43 / #55
#43 / #55
#43 / #55
2
3
4
290
385
480
580
770
960
4
4
4
120
130
153
A.F.U.E.
Pressure Switch Trip Point (" w.c.)
Blower Wheel (D" x W")
Blower Horsepower
Blower Speeds
Max CFM @ 0.5 E.S.P.
Power Supply
Fan Delay On Heating
Off Heating *
Fan Delay On Cooling
Gas Supply Pressure (Natural/Propane) (" w.c.)
Manifold Pressure (Natural/Propane) (" w.c.)
Orifice Size (Natural/Propane)
Number of Burners
2
Filter Size (in .)
Permanent
Disposable
Vent Connector Diameter (inches)
Shipping Weight (lbs.)
* Off Heating - This fan delay timing is adjustable (90, 120 or 150 seconds), 150 seconds as shipped.
Minimum Circuit Ampacity = (1.25 x Circulator Blower Amps) + ID Blower amps.3 Maximum Overcurrent Protection refers to maximum recommended fuse or
circuit breaker size.
NOTES: 1. All furnaces are manufactured for use on 115 VAC, 60 Hz, single phase electrical supply.
2. Gas Service Connection 1/2" FPT.
3. Important: It is required to size fuses and wires properly and make electrical connections in accordance with the National Electrical Code
and/or all existing local codes.
21