Download E-100-A - Applied TPG
Transcript
2 E-100-A Installation Instructions Heating Cable Types Outer jacket Braid Outer Braid jacket Outer jacket Inner jacket Heating element Braid Inner jacket Inner jacket Bus wire connection Clear jacket Conductive fiber Conductive core Insulated bus wire Spacer Bus wire VPL-CT Bus wire BTV-CR, BTV-CT, QTVR-CT 1 XTV-CT, KTV-CT 2 • Allow approximately 24 in (60 cm) of heating cable for installation. For VPL, cut cable 12 in (30 cm) from bus indentation. • Cut off heating cable end at about 45° for easier insertion. • Optional: If stand is to be installed on bottom side of pipe, knock out drain hole prior to inserting cable. • Push 12 in (30 cm) of heating cable through stand. Use cable lubricant if needed. 24" (60 cm) 12" (30 cm) 45° 12" (30 cm) Drain hole • Square off cable end with 90° cut. Indentation (bus wire connection on VPL heating cables only). • Do not attach stand to pipe until step 8. 3 • Determine heating cable type and continue as shown. VPL Go to Step 4a BTV and QTVR Go to Step 4b XTV and KTV Go to Step 4b