Download E-100-A - Applied TPG

Transcript
3
E-100-A Installation Instructions
4a
4b
VPL
BTV and QTVR
XTV and KTV
• Lightly score
outer jacket
around and down
as shown.
1 1/8"
(28 mm)
• Bend heating
cable to break
jacket at the
score, then peel
off jacket.
• Lightly score outer
jacket around and
down as shown.
• Remove all
exposed braid.
1 1/4"
(32 mm)
• Bend heating cable
to break jacket at the
score, then peel off
jacket.
• Lightly score inner
jacket around and
down as shown.
• Remove all exposed
braid.
• Bend heating cable
to break jacket
at the score then
peel off jacket.
1/2"
(13 mm)
Go to Step 5
• Un-wind heating
element, cut
and remove as
shown.
• Lightly score and
remove clear
jacket.
• Cut one bus wire.
1/4"
(6 mm)
Go to Step 5