Download InstallatIon and maIntenance manual GIUNTO
Transcript
SOSTITUZIONE SOSTITUZIONE OLIOPER PER IL GIUNTO OLIO IL GIUNTO ® ROTOFLUID® ROTOFLUID VERTICALE OIL CHANGE FOR VERTICAL ROTOFLUID® COUPLING I giunti contraddistinti dalla lettera ( C ) sono previsti per il funzionamento verticale. The couplings signed with the letter [C] are foreseen for a vertical operation. Il primo riempimento dell’olio deve essere eseguito con il giunto montato sul motore con l’asse in orizzontale come trattato a pagina 29. In seguito, per praticità, è possibile eseguire la sostituzione dell’olio con il giunto montato in verticale. first oil filling The first filling must mustbe be carried outthe withcoupling the coupling done with mounted on on the the engine enginewith with the shaft in a horizontal position, as shown on page 29. Afterward oil oil changes change can Afterward can be be carried outcouplings with couplings done with vertically vertically mounted. mounted. Questa operazione deve essere eseguita la prima volta dopo 2000 ore di funzionamento e successivamente ogni 4000 ore. This This operation operation must mustbe be done theout first time carried the firstafter time after 2000 2000 operating operating hours, hours,and and later later on on every every 4000 4000 hours. hours. Oppure, per l’impiego in ambienti particolarmente polverosi, ogni 1000 ore, nel seguente modo: In case of particularly dusty environments, change the oil every 1000 hours, by following the procedures described below: ATTENZIONE WARNING QUESTA OPERAZIONE DEVE ESSERE ESEGUITA DOPO AVER AVVIATO ANCHE PARZIALMENTE IL MOTORE PER METTERE IN SOSPENSIONE NELL’OLIO LE EVENTUALI IMPURITA’. INOLTRE IL MOTORE DELLA MACCHINA DEVE ESSERE FERMO E SCOLLEGATO DALLA TENSIONE SUL SEZIONATORE DI LINEA E DEVE ESSERE SEGNALATO L’INTERVENTO. IL GIUNTO DEVE ESSERE A TEMPERATURA AMBIENTE E NON SUPERIORE A 40°C. THIS OPERATIONMUST MUST THIS OPERATION BEBE DONE AFTER HAVING CARRIED OUT AFTER HAVING STARTED THEMOTOR, MOTOR, STARTED THE EVEN IFPARTIALLY PARTIALLYSTARTED, EVEN IF STARTED, IN PUT ORDER IN ORDER TO IN TO PUT IN SUSPENSION THE SUSPENSION THE POSSIBLE POSSIBLE OIL IMPURITIES. OIL IMPURITIES. THIS OPERATION SHOULD FURTHERMORE, THE ONLY BE DONE MACHINE MOTORWHEN MUSTTHE BE MACHINE IS SWITCHED STOPPED AND OFF, THE POWER IS THE DISCONNECTED FROM DISCONNECTED FROM THE LINE SELECTOR VOLTAGE, SOURCE AND THE LOCKAND THE ACTION MUST BE OUT TAG ENGAGED. THE NOTIFIED. THE COUPLING COUPLING MUST BE ATMUST ROOMBE AT ROOM TEMPERATURE AND TEMPERATURE, AND IT MUST NOT MORE THAN 4040°C. C. NOT BE MORE THAN LAVORI IN CORSO WORK IN PROGRESS OFF 1 1 Place a basin of a suitable capacity under the coupling for the oil collection. Predisporre una bacinella di capacità adeguata sotto al giunto per la raccolta dell’olio. 44 37