Download 4.13 MB - Erreka

Transcript
FENIX.book Page 53 Thursday, November 4, 2010 5:10 PM
INSTALLATION
1
English
NECESSARY TOOLS
Flathead screwdriver 0.6 x 3.5
Saw for cutting metal
Spanner 10mm
Ring spanner 10mm
Electric drill and broaches
 Use the electrical drill in line with the use
instructions.
Socket wrench 10mm
Marker pencil
Level
Tape measure
Ladder
 Use a robust ladder of sufficient height.
Respect the instructions on use.
2
NECESSARY MATERIALS
Screws to attach the strips to the ceiling, the front
support to the wall and the door anchoring to the door.
Instalacion_40.fm - 3/11/10
3
Track lubrication grease (graphite or lithium grease)
INITIAL CONDITIONS AND CHECKS
Door operation
Electrical power supply installation
The door must be easy to manipulate manually, namely:
• It must be balanced, in order to ensure the effort
made by the motor is minimum.
• There should be no stiffness throughout its travel.
Do not install the actuator in a door which does not
work correctly in manual operation, as this may lead
to accidents. Repair the door before installing.
The actuator has a power cable with a plug. There
should be an earthed current connection close by.
 Ensure the current connection and installation
fulfil the following requirements:
• The nominal voltage of the installation must
coincide with that of the actuator.
FENIX Overhead Actuator
53