Download 4.13 MB - Erreka
Transcript
FENIX.book Page 53 Thursday, November 4, 2010 5:10 PM INSTALLATION 1 English NECESSARY TOOLS Flathead screwdriver 0.6 x 3.5 Saw for cutting metal Spanner 10mm Ring spanner 10mm Electric drill and broaches Use the electrical drill in line with the use instructions. Socket wrench 10mm Marker pencil Level Tape measure Ladder Use a robust ladder of sufficient height. Respect the instructions on use. 2 NECESSARY MATERIALS Screws to attach the strips to the ceiling, the front support to the wall and the door anchoring to the door. Instalacion_40.fm - 3/11/10 3 Track lubrication grease (graphite or lithium grease) INITIAL CONDITIONS AND CHECKS Door operation Electrical power supply installation The door must be easy to manipulate manually, namely: • It must be balanced, in order to ensure the effort made by the motor is minimum. • There should be no stiffness throughout its travel. Do not install the actuator in a door which does not work correctly in manual operation, as this may lead to accidents. Repair the door before installing. The actuator has a power cable with a plug. There should be an earthed current connection close by. Ensure the current connection and installation fulfil the following requirements: • The nominal voltage of the installation must coincide with that of the actuator. FENIX Overhead Actuator 53