Download A2 SFD1/SGD1 Automatic welding machine
Transcript
INSTALLATION WARNING! Rotating parts can cause injury, take great care. S Place the flux tube in such a way that it does not get folded and that the flux covering is satsfactory. (UP welding) S Filling up with flux. (UP welding) dha3i1ea S Close the flux valve on the flux container. S Loosen the cyclone for the flux recovery unit (if fitted). S Fill with flux. NOTE! The flux must be dry. If possible, avoid using agglomerated flux outdoors or in humid environment. S Adjust the height of the flux nozzle above the weld to give the correct amount of flux. The flux cover should be thick enough to prevent arc penetration. -- 6 --
This document in other languages
- français: ESAB A2 SFD1 / SGD1
- Deutsch: ESAB A2 SFD1 / SGD1
- Nederlands: ESAB A2 SFD1 / SGD1