Download Serefina - Installation
Transcript
Note: If an optional Brick Liner Kit was purchased, install it now, per instructions provided in kit 5. Install the right front log onto the corresponding burner pin and sub-floor right tab as shown in Figure 21. 2. Place the largest log onto the rear log stoppers (see Figure 17). Ensure that the grooves on the bottom of the log aligns onto the corresponding places on the rear log stoppers. Push the log back so that it is against the back of the rear log stoppers (see Figure 18). Rear Log Right Front Log Figure 21 Figure 18 3. Place the left front log onto the corresponding burner pin and sub-floor left tab as shown in Figure 19. 6. Install the left top twig onto the corresponding pin on the rear log and align it with the indentation on the front left log as shown in Figure 22. Left Top Twig Figure 22 Figure 19 Left Front Log 7. Install the center top twig onto the corresponding pin on the rear log and align it with the indentation on front left log as shown in Figure 23. 4. Place the center log piece over the corresponding pins next to the front left log as shown in Figure 20. Center Top Twig Center Log Piece Figure 20 Figure 23 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. 21