6.1.1. Installing body
Unit: mm(in.)
Special nut A
Cealing openings and hanging bolt installation diagram
After installing the
body, tighten the nuts.
Hook
Special nut B
WARNING
When fastening the hangers, make the bolt positions
uniform.
135 (5-5/16)
30 (1-3/16)
or more
19 (3/4)
700 (27-9/16) (Decoration Panel)
570(22-7/16) (Indoor unit)
580-660 (22-27/32 - 25-31/32 ) (Cealing openings)
Unit: mm (in.)
540 (21-1/4) (Hanging bolt position)
75 (2-15/16)
150-200 (5-29/32 - 7-7/8 )
530 (20-7/8) (Hanging bolt position)
Hanging bolt
Ceiling
6.1.2. Leveling
Using a level, or vinyl hose lled with water, ne adjust so that
the body is level.
Vinyl hose
250 (9-27/32)
Min. 450 (17-23/32)
6.1.3. Installing drain pipe
Service access
Min. 450 (17-23/32)
Drain pipe (O.D. ø26.1) (1-1/32)
Unit: mm (in.)
30
(1-3/16)
Gas pipe
123 (4-27/32)
Liquid pipe
x
58 (2-9/32)
Ceiling
30 (1-3/16)
215 (8-15/32)
Control box
262 (10-5/16)
40 (1-9/16) 99 (3-29/32)
114 (4-1/2)
102 (4-1/32)
Note: Install the drain pipe.
x Install the drain pipe with downward gradient (1/50 to
1/100) and so there are no rises or traps in the pipe.
x Use general hard polyvinyl chloride pipe [3/4 in. (O.D.
1-1/16 in)] and connect it with adhesive (polyvinyl chloride) so that there is no leakage.
x When the pipe is long, install supporter.
x Do not perform air bleeding.
x Always heat insulate indoor section of drain pipe.
x When desiring a high drain pipe height, raise it up to 700 mm
(27-9/16 in.) or less from the ceiling within a range of 300 mm
(11-13/16 in.) from the body. A rise dimension over this range
will cause leakage. See gure on next page.
x Set up the entire piping lines at the position 100 mm
(3-15/16 in.) lower than the main body drain port, and use
the piping lines O.D. 33 mm (1-5/16 in.) or more with the
descending inclination to 1/100 or more.
bitions
NG:air bleeding
NG:Rise
Be sure to leave service access for future service at the designated
position.
(1) Install special nut A, then special nut B onto the hanging
bolt.
(2) Raise the body and mount its hooks onto the hanging bolt
between the special nuts.
NG:trap
(3) Turn special nut B to adjust the height of the body.
Pipe Size
WARNING
Perform nal tightening by tightening the double nut
rmly.
Drain pipe
3/4 in. (O.D. 1-1/16 in.)
En-7