Download INSTALLATION MANUAL
Transcript
6.1.1. Installing body Unit: mm(in.) Special nut A Cealing openings and hanging bolt installation diagram After installing the body, tighten the nuts. Hook Special nut B WARNING When fastening the hangers, make the bolt positions uniform. 135 (5-5/16) 30 (1-3/16) or more 19 (3/4) 700 (27-9/16) (Decoration Panel) 570(22-7/16) (Indoor unit) 580-660 (22-27/32 - 25-31/32 ) (Cealing openings) Unit: mm (in.) 540 (21-1/4) (Hanging bolt position) 75 (2-15/16) 150-200 (5-29/32 - 7-7/8 ) 530 (20-7/8) (Hanging bolt position) Hanging bolt Ceiling 6.1.2. Leveling Using a level, or vinyl hose lled with water, ne adjust so that the body is level. Vinyl hose 250 (9-27/32) Min. 450 (17-23/32) 6.1.3. Installing drain pipe Service access Min. 450 (17-23/32) Drain pipe (O.D. ø26.1) (1-1/32) Unit: mm (in.) 30 (1-3/16) Gas pipe 123 (4-27/32) Liquid pipe x 58 (2-9/32) Ceiling 30 (1-3/16) 215 (8-15/32) Control box 262 (10-5/16) 40 (1-9/16) 99 (3-29/32) 114 (4-1/2) 102 (4-1/32) Note: Install the drain pipe. x Install the drain pipe with downward gradient (1/50 to 1/100) and so there are no rises or traps in the pipe. x Use general hard polyvinyl chloride pipe [3/4 in. (O.D. 1-1/16 in)] and connect it with adhesive (polyvinyl chloride) so that there is no leakage. x When the pipe is long, install supporter. x Do not perform air bleeding. x Always heat insulate indoor section of drain pipe. x When desiring a high drain pipe height, raise it up to 700 mm (27-9/16 in.) or less from the ceiling within a range of 300 mm (11-13/16 in.) from the body. A rise dimension over this range will cause leakage. See gure on next page. x Set up the entire piping lines at the position 100 mm (3-15/16 in.) lower than the main body drain port, and use the piping lines O.D. 33 mm (1-5/16 in.) or more with the descending inclination to 1/100 or more. bitions NG:air bleeding NG:Rise Be sure to leave service access for future service at the designated position. (1) Install special nut A, then special nut B onto the hanging bolt. (2) Raise the body and mount its hooks onto the hanging bolt between the special nuts. NG:trap (3) Turn special nut B to adjust the height of the body. Pipe Size WARNING Perform nal tightening by tightening the double nut rmly. Drain pipe 3/4 in. (O.D. 1-1/16 in.) En-7 9374318438-05_IM.indb 7 9/10/2010 11:10:07 AM