Download PELLBOX SCF
Transcript
sk tecnica pellbox multilingua_def.qxp 10/12/2008 17.27 Pagina 24 ENGLISH POSSIBLE INSTALLATION LAYOUTS (fig. 2) A: internal flue up to roof B: external brick-built flue C: internal brick-built flue D: external double-walled steel flue (for the following installation, the entire flue must have a well insulated double wall) * two air circulation grilles (36 x 9 cm, provided) on the front and/or right side of the fireplace (looking from the front) 23