Download 1. introduction

Transcript
d) Calibrate the indicator following the instructions on its technical manual.
e) Check the corners (see paragraph 5) of the platform by positioning on these (one at a time) a
weight equal to 1/3 of the indicator’s maximum capacity. Check that the error is not greater than + /
- 2 divisions and If this is not the case, contact the RESELLER.
f) Using a reference weight, check the zero and the full-scale capacity.
Fig. 3
1)
2)
3)
4)
5)
6)
Loading top
Foot
Load cell
Bolts
Junction box
Screw
7) Side Bar
8) Screw cap
9) Loading ramp
10) Screened cable to the indicator
11) Level bubble
12) Bolts (Loading ramp)
9