User Guide Purlin Drop Rail(With Drop Clamp) Note: - Maximum Post spacing is 3000mm. - Installer must manage working at heights in accordance with state legislation under the OH+S act. Rails 2D Post (CR0200) Drop Clamp (CR0050) Bottom Post (CR0180) Support Bar G-Clamp (CR0010) Step – 1 Step – 2 Position the G-Clamps on Purlins. Slide the Drop Clamps into the G-clamps and tighten wing Bolts. User Guide Purlin Drop Rail(With Drop Clamp) Step – 3 Step – 4 Slide support bar in both drop Clamps and tighten the wing bolts. Slide Bottom post on Support bar and tighten Wing bolt. Step – 5 Step – 6 Slide 2D post into the Bottom Post and tighten wing bolt. Make sure that the top rail is minimum 900mm above roof level. Make sure “D'S” are facing working area. Slide rails into 2D post and tighten 'L' bolts.