Download Operating instructions Maintenance instructions
Transcript
Every 500 operating hours 5.19 Checking the V-belt tension, tightening Checking the V-belt Fig. 77 l Inspect the entire circumference of the V-belt visually for damage and cracks. l Replace damaged or cracked V-belts. l Check with thumb pressure whether the V-belt can be depressed more than 10 ... 15 mm between the V-belt pulleys (Fig. 77), retighten the V-belt if necessary. Retightening the V-belt Fig. 78 l Slightly slacken the fastening screw 1 (Fig. 78). l Press the idling pulley (2) in direction "I", until the correct V-belt tension is achieved. l Tighten the fastening screws (1). 62 BOMAG BW 145 D-3/DH-3/PDH-3