Download VIAFILL Operating instructions

Transcript
VIAFILL – Operating instructions V02
Installation of optional accessories
2) Remove the VIAFILL reservoir and stage:
Simply slide the reservoir holder out of the VIAFILL base.
Three cross slot screws (a) need to be removed on the
underside of the plate deck (5). This will allow the entire
plate deck to be removed.
a
3) Slide the VIAFILL onto the stacker:
Slide the VIAFILL from the back onto the stacker base
unit (43).
The VIAFILL feet will fit into four holes (b) on the deck of
the stacker.
b
4) Insert the reservoir:
c
Attach the waste tubing to the reservoir and tighten the 2
screws (c) with a hexagon wrench.
5) Asseble the chimneys:
Assemble stacker chimney support brackets with 2
hexagon head screws and washers each (d) on stacker
base by using hexagon wrench.
d
d
www.integra-biosciences.com
25