PROJECT in a box – Version 3.4.1
Admin Course Notes
Project Summary Info - Stage (Highlight) Summary Info
Overview
Much like the Project Summary information, a subset can be recorded for each stage if this is
appropriate. Some of this stage summary Information is used as a hardwired source of data
for the reports and dashboard, other parts of it can be replaced by a source spreadsheet to
allow the information in each stage to be customised.
The Stage summary information form is accessed from the Project summary information form,
stages tab by selecting the appropriate stage and clicking on it. ‘Stage’ here can be aliased by
the method template so may appear as ‘project’, ‘sub-contract’ or some other term if altered to
reflect a different methodology.
Steps
1. Both viewing and editing use the tabs to navigate and view content.
2. Use the Spreadsheet tab to replace the standard Stage content with a spreadsheet
content instead. The reporting will then pick this up as an alternate source of data for
the stage/highlight elements of reports. Note: this does not replace statuses which
are still obtained from the General and Status tabs for RAG & Dashboard.
3. When editing use the various text boxes, pick lists and prompts to provide status on
the project stage.
Screens
Notes
Modifications here can only be undertaken by Modify users, if the PM is unavailable and has
delegated report preparation to another project user, that user will need additional
permissions during the period to modify the content of the project Summary Info.
This information relates to a single Stage so with a multi stage project these can all be
different for example one could be drawn from a custom spreadsheet while others were
drawn from the form.
Note the extended properties and Status questions are under the control of the Method
template for the project and may differ to that shown here.