Download Installation and Operating Instructions
Transcript
TaskManager application 8 Step 2: Selecting a task to process 2. - Confirm. ⇨ The data are not on the terminal yet, but are ready to be downloaded. 3. - Load the data from the portal. (the arrow on the icon must point downwards) ⇨ The following notification will appear: “Start downloading task data?“ 4. - Confirm. ⇨ The data are being loaded. 5. Open the "Task list" screen. ⇨ All tasks from the set of tasks will appear on the "Task list" screen. ⇨ You have received a set of tasks from the dispatcher. You can process the tasks from the set of tasks. 8.7 Step 2: Selecting a task to process Before you start working, you must first select the task you wish to process. The following options are available to you: ▪ Create a new task on the terminal ▪ Resume an existing task 8.7.1 Creating a new task on the terminal You can create a new task directly on the terminal. When creating a task directly on the terminal, you will not need to fill it with task data right away. You can process a task and then enter into the Farm Management Information System what you have done and on which field. The following options are available to you: ▪ Create a new task on the terminal ▪ Copy an existing task and save the copy as a new task Creating a new task Procedure 62 1. Switch to the "Master data" screen. Copyright © Müller-Elektronik GmbH & Co.KG