Download INSTALLATION MANUAL
Transcript
Wireless remote controller (High wall type 2 series) REQUIREMENT 1. For the operation procedure, be sure to follow the Owner’s Manual. 2. Finish the forced cooling operation in a short time because it applies excessive strength to the air conditioner. 3. A test operation of forced heating is unavailable. Perform a test operation by heating operation using the switches of the remote controller. However heating operation may be not carried out according to the temperature conditions. • Check wiring/piping of indoor and outdoor units 1. Open the front panel. 2. When pushing “TEMPORARY” button for 10 seconds or more, “Pi!” sound is heard and the operation changes to a forced cooling operation. After approx. 3 minutes, a cooling operation starts forcedly. Check cool air starts blowing. If the operation does not start, check wiring again. 3. To stop a test operation, push “TEMPORARY” button once again (Approx. 1 second). The up/down air flow adjusting plate closes and the operation stops. • Check transmission of remote controller 1. Push “START/STOP” button of the remote controller to check an operation can also start by the remote controller. • When pushing “TEMPORARY” button once (For 1 second), the operation changes to automatic operation. For a forced cooling operation, keep the “TEMPORARY” button pushed over 10 seconds. • “Cooling” operation by the remote controller may be unavailable according to the temperature conditions. Check wiring/piping of the indoor and outdoor units in forced cooling operation. TEMPORARY TEMPORARY button 154