Download E-techW Installation Manual
Transcript
INDEX WARNINGS 2 Who should read these instructions Symbols Recommendations Applicable standards Importants notes Manual handling instructions Removing the boiler from the packaging 2 2 2 2 2 2 2 INTRODUCTION 3 Description of the specifications Lining Heating body Heating elements Equipment Connection Dual stage thermostat Certification Legend 3 3 3 3 3 3 3 3 3 INSTRUCTIONS 5 User data Setting up Optional internal timeclock Pressure in the heating system 5 5 5 5 TECHNICAL CHARACTERISTICS 6 Electrical data of model 09 Electrical data of model 15 Power variation (kW) relative to voltage Electrical data of model 22 - 28 - 36 7 8 8 9 MOUNTING 10 Dimensions Wall mounting Installation room 10 10 10 INSTALLATION 11 Disassembling Heating connection Heating connection + DHW : “Y” plan Heating connection + DHW : “S” plan Electric connection / Models : 09 - 15 Electric connection / Models : 22 - 28 - 36 Sizing of supply wires Wiring diagrams / Models : 09 - 15 - 22 Wiring diagrams / Model : 28 Wiring diagrams / Model: 36 Power wiring / Models : 09 - 15 Power wiring / Model : 22 Power wiring / Model : 28 Power wiring / Model : 36 11 12 12 12 13 14 14 15 16 17 18 19 20 21 HONEYWELL SUNDIAL WIRING DIAGRAMS 22 Honeywell Sundial Wiring Centre ‘S’ plan Honeywell Sundial Wiring Centre ‘Y’ plan 22 23 COMMISSIONING AND MAINTENANCE 24 Commissioning - Water Commissioning - Electrical Starting the boiler Maintenance 24 24 24 24 REMOVAL THE HEATING ELEMENTS 25 SPARE PARTS 26 -1-