Download Resources User Guide - 2KB
Transcript
Operations Click on the box to the left of Get Plan [ScheduleKey] from AMS REALTIME Resources in the Operation section of the dialog. The contents of the ScheduleKey in the AMS REALTIME Projects Schedule Extension Labels must match with the contents of the AMS REALTIME Resources Filename field, (or the field that has the TaskFile attribute). The contents of this field in the AMS REALTIME Resources dataset determine the AMS REALTIME Projects schedule to which the activity belongs. Clicking on the arrow to the right of this box will provide a picklist of all the different Filename contents in the Activity dataset. Selecting a ScheduleKey match from the list is the method used to select the data you will load into the schedule. Options for Data Exchange The Options section of the dialog controls several aspects of Plan and Actuals communications between the two systems. Multiple options can be concurrently selected. Post Progress will bring calculated Progress from the AMS REALTIME Resources dataset into the schedule. A Progress field can be defined as the percentage of the actual hours completed compared to the estimated hours to complete. A calculated Progress field and other related field definitions are provided in the Sample dataset (sample.dst) that is distributed with AMS REALTIME Resources. If Adjust Requirement Level is selected, AMS REALTIME Resources will modify existing Level type requirements in the project schedule. The resource increment will be used to spread out the new requirement between the planned start and planned complete dates. If Replace Requirements is selected, the current project requirements in the schedule will be completely replaced with the current AMS REALTIME Resources plan. If Level of Effort is selected, new plan requirements from AMS REALTIME Resources will become Level type requirements in AMS REALTIME Projects. Existing Effort-driven requirements will be updated with the Planned Level-of-Effort, as well as Actual and Total Hours. This allows the remaining work to recalculate the duration of the activities in AMS REALTIME Projects. Activity Date Options The Activity Dates section of the dialog controls how activity start and complete dates are stored in the project schedule when the dates differ. Only one option can be selected. If Calculated is selected, the planned start and complete dates from AMS REALTIME Resources are used to update the activity start and complete dates. Before the operation, a baseline revision called 142 AMS REALTIME Resources User Guide Advanced Management Solutions, Inc., Issue 1.1