Download Operating Instructions for the SYSTEM TOOLS HSBL
Transcript
16 Maintenance ATTENTION ! UNCOUPLE THE HYDRAULIC UNIT OR DISCONNECT IT FROM THE MAINS BEFORE CARRYING OUT MAINTENANCE WORK. After each use: Remove any dirt, chips etc. from the HSBL plying iron and the HA2-V. Every week: Clean HSBL plying iron. HA2-V After every 3 months: Grease thread of the HA2-V.