Download Operating Instructions
Transcript
INSTALLATION / COMMISSIONING Fluidic installation Safety notes ATTENTION! The pneumatic connections shall not be pressurized during installation! Make the connections with as large a volume as possible. Close off unused, open ports with screw caps! The ports for the pilot valve exhaust (x) shall not be closed off! Check allocation according to instructions of ports 1 and 3 or 5: these shall under no circumstances be swapped! Pneumatic connections - supply units Exhaust air W (R/S) 3/5 W X (P) 1 W Standard model: Auxiliary air control model: Venting of the pilot valves P-port for the pilot valves Pressure supply port Procedure Plug (D10) or screw (G 1/4, NPT 1/4) the connections, depending on the version, into the respective service ports. Notes on plug connections NOTE For the plug connections the hoses must fulfil the following requirements: • Minimum hardness of 40 Shore D (to DIN 53505 or ISO 868); • Outside diameter to DIN 73378 (max. permissible deviation ± 0.1 mm from nominal dimension); • Free from burrs, cut off at right angles and undamaged over outer circumference; • The hoses shall be pushed into the plug connectors as far as they will go. Disassembly of the plug connections To release the hoses, depress the pressure ring and pull out the hose. 8644/phoenix - 11