Download Everbilt AUTOJ100A2 Instructions / Assembly

Transcript
PUMP IS PRESET TO 230 VOLTS. CHECK YOUR POWER SOURCE
(EITHER 115 VOLTS OR 230 VOLTS), AND MAKE SURE PUMP IS
SET TO CORRECT SETTING.
1. POWER off
2. Slide to the proper voltage
3. POWER on
Determine the depth of your well
25 ft. maximum
10 ft. minimum
5 ft. minimum
1. Tie a small but heavy weight such as a fishing weight to the end of a piece of cotton string.
2. Lower the weight into the well until it reaches the bottom of the well.
3. Make a mark on the string at ground level.
4. Pull the weight out of the well and measure from the bottom of the weight to the ground
level mark.
5. This is the depth of your well. Subtract five feet from the depth of your well. This number
should not exceed 25 feet.
6. Measure the ground level mark to the mark where the string is wet. This number is your
well’s water level.
7. It should also be at least 10 feet below the well’s water level while the pump is running in
order to prevent the pump from sucking air due to water level drawdown.
Bottom of well
Application
To Household
Water System
6
5
4
25ft Max.
3
2
1. Foot Valve
2. Pipe
3. Well Seal
4. Priming Tee and Plug
5. Check Valve
6. Priming Tee and Plug
10 ft Min.
1
5-10 ft Min.
YOU MAY ALSO NEED
Screwdriver
Hack Saw
Tape Measure
PVC
Channel Locks
1 in. foot valve
PVC Glue
1 in. discharge tee
Thread Tape
Well seals