Transcript
Silver Silent Guard Quality Underlayment for Laminate Engineered Wood & Floating Hardwood Flooring Installation Options & Instructions: Be sure the subfloor is solid, clean and dry. A moisture test is recommended before all flooring installations. For SUSPENDED ON GRADE or BELOW GRADE floors: Roll Silver Silent Guard underlayment over subfloor, moisture barrier down. For SUSPENDED ON GRADE, Silver Silent Guard can be installed moisture barrier up as a spill guard protector. For ON GRADE or BELOW GRADE where moisture is a concern install Silver Silent Guard moisture barrier down. Recommend taping seams underneath against subfloor. Seams need to be butted together flush; do not overlap the pad. Tape seams with water and tear resistant utility-grade polycoated tape that has an aggressive adhesive. Install flooring according to manufacturer’s installation instructions.