Download Eaton 9155
Transcript
UPS ONLY INSTALLATION NOTE Input neutral must be wired for proper operation. Failure to connect an input neutral will void the warranty. Table 1. UPS Terminal Block (TB1) Wiring Wire Function Input Ground AUX Not Used Output Input Circuit Breaker Rating Terminal Position Minimum Wire Size* TB1‐1 8 AWG TB1‐2-1 and 2-2 — TB1‐2A-1 and 2A-2 — 8 kVA 10 kVA 12 kVA 15 kVA 4 AWG (21.2 mm2) 3 AWG (26.7 mm2) 2 AWG (33.6 mm2) 2 AWG (33.6 mm2) 60A 80A 100A 100A L1 TB1‐3 Neutral TB1‐4 L2 TB1‐5 L1 TB1‐6 8 AWG Neutral TB1‐7 8 AWG L2 TB1‐8 8 AWG TB1‐8A-1 and 8A-2 — TB1‐9 8 AWG Not Used Ground Tightening Torque Conduit Connection (Entry Size) 25 lb in (2.83 Nm) 2” access hole for 1‐1/2” conduit 25 lb in (2.83 Nm) 2” access hole for 1‐1/2” conduit * Use only 75°C-rated copper wire. Minimum wire size is based on 120/208 full load ratings applied to NEC Code Table 310‐16. Code may require a larger AWG size than shown in this table because of temperature, number of conductors in the conduit, or long service runs. Follow local requirements. 1 TB1 3 4 5 6 7 8 2 2A 9 8A Input Output Figure 7. UPS Terminal Block Eaton 9155 UPS (8–15 kVA) User's Guide S 164201553 Rev G (www.eaton.com/powerquality) 15