Download Netra T2000 Server Installation Guide

Transcript
Figures
FIGURE 1-1
Netra T2000 Server Front Panel
1
FIGURE 1-2
Netra T2000 Server Rear Panel
2
FIGURE 1-3
Netra T2000 Server
FIGURE 1-5
UltraSPARC T1 Multicore Processor Block Diagram
FIGURE 2-1
Finger Holds on Bezel
FIGURE 2-2
Installing the Air Filter in the Bezel
FIGURE 2-3
Sections of the Slide Rail Assembly
FIGURE 2-4
Locating the Locks on the Slide Rail Assembly
19
FIGURE 3-1
Contents of the Hardmount 19-Inch 4-Post Kit
23
FIGURE 3-2
Securing the Hardmount Brackets to the Server
FIGURE 3-3
Attaching the Rear Mount Support Brackets
25
FIGURE 3-4
Securing the Front of the Server to the Rack
25
FIGURE 3-5
Securing the Rear of the Server to the Rack
26
FIGURE 3-6
Contents of the Sliding Rail 19-Inch 4-Post Kit
27
FIGURE 3-7
Securing the Hardmount Bracket to the Server
28
FIGURE 3-8
Dismantling the Slide
FIGURE 3-9
Fixing the Glides to the Server Chassis
FIGURE 3-10
Securing the Brackets to the Rack
30
FIGURE 3-11
Securing the Slide to the Brackets
31
FIGURE 3-12
Sliding the Server Into the Rack
2
5
16
17
18
24
29
29
32
vii