Download Netra t 1120/1125 Installation Guide
Transcript
Install.book Page 20 Wednesday, August 19, 1998 1:45 PM point located near the equipment. An AC socket outlet protected by a double pole double throw circuit breaker may be required by national and/or local electrical authorities. Note – Do not open the top access cover unless the system has been powered down and all power cables have been removed. Dual Grounding Environment To be compatible with isolated ground environments (requiring isolation between logic 0V and chassis ground), the fitted grounding bridge plate must be removed and individual connections made to logic 0V and chassis ground studs. The grounding bridge plate is located on the rear of the unit (see FIGURE 3-2). Grounding bridge plate Chassis earth stud FIGURE 3-2 20 Netra t 1125 Grounding Points Netra t 1120/1125 Installation and Basic Maintenance Guide • August 1998