Download Sun StorEdge T3 Array Controller Upgrade Manual
Transcript
The Sun StorEdge T3 array enterprise configuration incorporates an additional controller unit. The top unit in an enterprise configuration is referred to as a the alternate master controller unit, as shown in FIGURE 1-3. Alternate master controller unit Ethernet connection Interconnect cables HBA FC-AL connection HBA Application host Master controller unit Ethernet connection LAN Management host Ethernet port FIGURE 1-3 Sun StorEdge T3 Array Enterprise Configuration Upgrade Requirements Before you perform the upgrade procedure: ■ Make sure you have all necessary parts and equipment contained in the Sun StorEdge T3 array kit: ■ ■ ■ ■ ■ ■ ■ Make sure your system meets the requirements in this section, which is divided into the following topics: ■ ■ 6 One array controller card One 0.4 meter fiber-optic cable One fiber-optic cable connector This manual One antistatic wrist strap One latch release tool “Enterprise Upgrade Requirements” on page 7 “Workgroup Upgrade Requirements” on page 9 Sun StorEdge T3 Array Controller Upgrade Manual • June 2001