Download Installation - Hydro
Transcript
PH 763-331-3066 [email protected] HYDRO-SHARK 3 ® MODULATING MICRO BOILERS Radiant Floor Heating Applications INSTALLATION INSTRUCTIONS FOR THE LICENSED PLUMBER & ELECTRICAN UL 834 MODEL #’S: • SH3-12-834 • SH3-14-834 • SH3-19-834 • SH3-24-834 • SH3-29-834 • SH3-36-834 MODEL #’S: • SH3-07-499 • SH3-10-499 Warning: Not to be used with potable water systems 1 Table of Contents Important 3 General 3 Mounting the units 4 Fluid connections 5 Electrical connections 6,7 Technical data - Warranty - Spare Parts 8,9 10,11 1-Zone Primary/Secondary Piping & Wiring Zoning by Circulator Pumps Pirmary/Secondary Piping & Wiring 12,13,14 Zoning by Zone Valves Primar/Secondary Piping & Wiring 15,16,17 Zoning by Telestat Primary/Secondary Piping & Wiring 18,19,20 21,22 Trouble Shooting Flow Chart Filling the System 23 Heater Pressure Drop Curves 24 Floor Sensing Thermostat Wiring 25 2 IMPORTANT! BOILERS ARE TO BE USED FOR RADIANT FLOOR HEATING ONLY! THIS MANUAL MUST BE READ CAREFULLY BEFORE ATTEMPTING TO INSTALL THE HYDRO-SHARK BOILERS. IF YOU DO NOT FOLLOW THE SAFETY RULES OR THE INSTRUCTIONS OUTLINED IN THIS MANUAL, THE UNIT MAY NOT OPERATE PROPERLY AND IT COULD CAUSE PROPERTY DAMAGE, SERIOUS BODILY INJURY AND/OR DEATH. STIEBEL ELTRON, INC. WILL NOT BE LIABLE FOR ANY DAMAGES BECAUSE OF FAILURE TO COMPLY WITH INSTALLATION AND OPERATING INSTRUCTIONS OUTLINED IN THIS MANUAL OR BECAUSE OF IMPROPER USE. IMPROPER USE INCLUDES THE USE FOR THIS APPLIANCE TO HEAT ANY LIQUID OTHER THAN WATER OR PROPYLENE GLYCOL. FALURE TO COMPLY WITH THE INSTALLATION AND OPERATING INSTRUCTIONS OR IMPROPER USE VOIDS THE WARRANTY. NEVER REMOVE THE UNITS FRONT COVER UNLESS POWER IS TURNED OFF. IF YOU HAVE ANY QUESTIONS REGARDING THE INSTALLATION OR OPERATION OF THES BOILER, PLEASE CALL OUR TECHNICAL SERVICE LINE AT 800-582-8423 (U.S.A. AND CANADA ONLY). IF YOU ARE CALLING OUTSIDE OF THE U.S. AND CANADA CALL (413)-538-7850 AND WE WILL REFER YOU TO A QUALIFIED STIEBEL ELTRON SERVICE REPRESENTATIVE IN YOUR AREA. GENERAL • The output of heat from the boiler is electronically controlled. The Boiler will deliver any water tempeture between 86° F and 140° F for the SH3-12,SH3-14, SH3-19, SH3-24. Please set the de- sired water delivery tempeture using the knob on the front cover. • When the Power light is flashing, full element power is being applied. When the Power light is not flashing, the element power is being modulated to the water delivery temperature. • Recommended Setting for radiant floor heating in cement or gypcrete is 105° F to 125° F. • Recommended Setting for staple up (floor warming) 130° F to 140° F. 3 MOUNTING THE UNIT SH3-12, SH3-14, SH3-19, SH3-24, SH3-29 UNIT MUST BE INSTALLED IN A VERTICAL POSITION WITH THE WATER FITTINGS POINTING DOWNWARD, DO NOT INSTALL UNIT WHERE IT WOULD ROUTINELY BE SPLASHED WITH WATER OR ELECTRICAL SHOCK MAY RESULT. 1. Leave a minimum of 5” of Clearance on all sides for servicing. 2. Make sure that the Power is Off. 3. Remove the Cover. 4. Mount securely to wall by putting four screws through mounting holes. 5. Screw and plastic wall anchors for mounting on masonry or wood are provided. 4 FLUID CONNECTIONS NOTE: EXCESSIVE HEAT FROM SOLDERING COPPER PIPES NEAR THE BOILER MAY CAUSE DAMAGE. 1. All plumbing work must comply with the national, state, local & any other applicable codes. 2. Make sure the radiant floor system has been purged & is free of floating debris. 3. The return side (inlet) is on the right side of the unit, the supply side (outlet) is on the 4. A pressure & temprature relief valve should be installed on the hot water supply side (outlet) of the unit. 5. The boiler is designed for a connection to copper tubing and/or PEX tubing. If soldering the left of the unit. unit is necessary, please direct the flame away from the housing of the unit to avoid damage. 6. When all plumbing work is completed, check for leaks & take corrective action before proceeding. 5 ELECTRICAL CONNECTIONS WARNING: BEFORE BEGINNING ANY WORK ON THE ELECTRIC INSTALLATION, BE SURE THAT THE MAIN BREAKER PANEL SWITCHES ARE “OFF” TO AVOID ANY DANGER OF ELECTRIC SHOCK. ALL MOUNTING AND PLUMBING MUST BE COMPLETED BEFORE PROCEEDING WITH ELECTRICAL HOOK-UP. WHERE REQUIRED BY LOCAL,STATE OR NATIONAL ELECTRICAL CODES THE CIRCUITS SHOULD BE EQUIPPED WITH A “ GROUND FAULT INTERRUPTER”. 1. All electrical work must comply with the national, state, local & any other applicable codes. 2. The boiler should be connected to properly grounded dedicated branch circuits of proper voltage rating. Ground must be brought to the ‘Ground’ at the circuit breaker panel. 3. SH3-12 can be connected to ONE independent circuit (Figure A & B). 4. A SH3-14, SH3-19 & SH-24 can be connected to TWO independent circuits (Figure C). Use supply table (See Technical Data table “B” on page 8). Protected by TWO double pole breakers sized for the load. 5. A SH3-29, can be connected to THREE independent circuits (Fig D.). Use supply cable (See Technical Data Table “C”) protected by THREE double pole breakers sized for the load. 6. Cut the electrical connection cable to length and strip. 7. The wire must be fed through the knockouts located between the Supply and Return fluid connections. The “Live” wires must be connected to the slots on the terminal block marked “L” and “L”. The ground wire must be connected to slot marked with the ground symbol. 8. Reinstall the cover screws. WARNING! As with any electrical appliance, failure to electrically ground may result in serious injury or Death. 6 (Fig. 3) (Fig. 2) (Fig. 1) SH3-29,SH3-36 SH3-14,SH3-19,SH3-24 SH3-12 SH3-36 SH3-24 SH3-29 SH3-14, SH3-19 7 SH3-12 TECHNICAL DATA “B” MODEL - 14 1/2 H X 16 5/8 W X 4 5/8 D - 3/4 PLUMBING FITTINGS MODEL KW BTU VOLTS AMPS BRKR WT-LBS SH3-12 12 40,968 240 50 (1)70 17 SH3-14 14.4 49,161 240 60 (2)40 20 SH3-19 19.2 65,548 240 80 (2)50 20 SH3-24 24 81,936 240 100 (2)70 20 “C” MODEL - 14 1/2 H X 16 5/8 W X 4 5/8 D 3/4 PLUMBING FITTINGS MODEL KW BTU VOLTS AMPS BRKR WT-LBS SH3-29 28.8 98,323 240 120 (3)50 24 SH3-36 36 122,904 240 150 (3)70 24 NOTE: 1. Boilers are considered a continuous load. 2. Copper conductors only. 8 WARRANTY RESIDENTIAL & COMMERCIAL WARRANTY: STIEBEL-ELTRON WARRANTS TO THE ORIGINAL OWNER THAT ALL BOILERS (SH3-SERIES) WILL BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF THREE YEARS FROM THE DATE OF PURCHASE. SHOULD THE PART(S) PROVE TO BE DEFECTIVE UNDER NORMAL USE DURING THIS PERIOD STIEBEL-ELTRON, INC. WILL BE RESPONSIBLE FOR THE REPLACEMENT OF THE DEFECTIVE PART(S) ONLY. STIEBEL-ELTRON,INC. IS NOT RESPONSIBLE FOR LABOR CHARGES TO REMOVE AND OR REPLACE THE DEFECTIVE PART(S), OR ANY INCIDENTIAL OR CONSEQUENTIAL EXPENSES. SHOULD THE OWNER WISH TO RETURN THE BOILER FOR REPAIR, THE OWNER MUST FIRST SECURE WRITTEN AUTHORIZATION FROM STIEBEL-ELTRON, INC. THE OWNER SHALL BE REQUIRED TO SHOW PROOF OF PURCHASE DATE AND PAY ALL TRANSPORTATION (Shipping,Duties,Brokerage Fees etc...) COSTS BOTH DIRECTIONS FOR DEFECTIVE PART(S) OR BOILER FOR REPAIR OR REPLACEMENT. WARRANTY IS VOID IF BOILER HAS BEEN INSTALLED OR USED IMPROPERLY OR IF DESIGN HAS BEEN ALTERED IN ANYWAY. SPARE PARTS Hydro-Shark 12 Hydro-Shark 14 Hydro-Shark 19 Hydro-Shark 24 Hydro-Shark 29 Hydro-Shark 36 1 2 3 4 5 6 Saftey thermal cut out Flow Sensor Electronic control Board Housing Electronic Setpoint selector Heating System SH286369 SH286461 SH286366 SH286356 SH286359 SH286360 SH286369 SH256461 SH286844 SH286356 SH286359 SH286361 SH286369 SH256461 SH286844 SH286356 SH286359 SH286362 SH286369 SH256461 SH286367 SH286356 SH286359 SH286364 SH286369 SH256461 SH286378 SH286370 SH286372 SH286373 SH286369 SH256461 SH286378 SH286370 SH286372 SH286374 HYDRO SMART™ WHOLESALE INC. 19974 IGUANA STREET NW - NOWTHEN, MN 55330 PHONE: 763-331-3066 FAX: 763-241-9628 EMAIL: [email protected] 9 1-Zone Primary/Secondary Piping System 10 L1 L2 L1 L2 Power 110 115 40 120 35 125 130 135 140 C 30 Fluid Supply 50 105 DFE NTC L1 L1 Ckt 2 L2 L1 Ckt 3 Fluid Return Power Light "Blinking" - Full Element Power. Power Light "Steady On" - Modulating Element Power Power Light "Off"- Element Power Off. Boiler Is Flow Activated Ckt 1 L2 L2 Wires sized for Load 240 Vac 2-Wire W/Gnd 3 Places H 120 Vac N Power Cord for Controller Com J6 4 4 Com NO NC 3 N GR 6 5 NC NO Com 6 SR501 Switching Relay T T Zone 1 J5 C X 72 Deg Thermostat 16-2 W/gnd 120 Vac 16-2 W/gnd 120 Vac N Primary (Boiler) Circulator Zone1 Seconday (Load) Circulator Zone1 CP3S15-62FC H N CP3S15-62FC H Zone 1 T'Stat Power 18-22 Awg 2-Wire 24 Vac Operated by AA Batteries TH135 Thermostats Wiring Diagram using TH135 T'Stat and Taco SR501 with Hydro Shark 3 & Mighty Might 55 95 90 86 F 60 100 Electric Micro-Boiler with Temperature Control STIEBEL ELTRON Hydro-Shark 3 Electric Boilers Mighty Might Electric Boilers Double Pole Breaker Double Pole Breaker L1 To Flow Sensor WHT WHT L2 BLK Double Pole Breaker BLK Electric Service Panel To Output Pipe Sensor BLK BLK Boilers: SH3-07, 10, 12, 14, 19, 24, 29, 36 WHT Integrator Panels: HSPS120LT Zoning Panels: None GRN Zone 1 WHT This wiring diagram works with the following components: BLK Hydro Smart, Inc.. 763-331-3066 [email protected] www.hydro-smart.com GR N 11 Zoning By Pumps Primary/Secondary System 12 L1 L2 L1 L2 L1 L2 55 95 90 86 F 60 50 105 Power 110 115 40 120 35 125 130 135 140 C 30 Fluid Supply 100 Electric Micro-Boiler with Temperature Control STIEBEL ELTRON DFE Hydro-Shark 3 Electric Boilers Mighty Might Double Pole Breaker Double Pole Breaker Double Pole Breaker Electric Service Panel Boilers: Hydro Shark 3 - 07,10,12,14,19,24,29,36 NTC L1 L1 Ckt 2 L2 L1 Ckt 3 Fluid Return Power Light "Blinking" - Full Element Power. Power Light "Steady On" - Modulating Element Power Power Light "Off"- Element Power Off. Boiler Is Flow Activated Ckt 1 L2 L2 Wires sized for Load 240 Vac 2-Wire W/Gnd 3 Places J6 Primary (Boiler) Circulator CP3S15-62FC Power Cord 120 Vac 120 VOLT IN N P ZC H T T Zone 1 J5 C X Pre-wired Installed by others SR502/SR503 Switching Relay HS1T2ZPMP, HS1T3ZPMP HS2T2ZPMP, HS2T3ZPMP COM WHT Zoning Panels: 24 VAC Wiring Diagram for Hydro-Shark 3 & Mighty Might 3-Zone by Pumps with TH135 Thermostats T WH X1 X2 T T Zone 2 J5 H N Zone 1 J6 C X 72 Deg BLK 72 Deg BLK GR N H BLK GR N HSPS120MPL GRN H J5 N H N Zone 3 16-2 W/gnd 120 Vac J6 C X 72 Deg Thermostat Zone 3 T T Zone 3 Zone 2 16-2 W/gnd 120 Vac WHT Integrator Panels: T WH Thermostat BLK Thermostat WHT Zone 2 BLK Zone 1 GRN This wiring diagram works with the following components: To Flow Sensor H N H N H N Zone 3 T'Stat Zone 2 T'Stat Zone 1 T'Stat Power Zone1 CP3S15-62FC Zone 2 CP3S15-62FC Zone 3 CP3S15-62FC 18-22 Awg 2-Wire 24 Vac 3 Plcs Operated by AA Batteries TH135 Thermostats Note: For Zone 1 priority Remove Jumper Between "P & "ZC" Terminals 16-2 W/gnd 120 Vac GRN Hydro Smart, Inc. 763-331-3066 [email protected] To Output Pipe Sensor WHT 13 N L1 L2 L1 L2 L1 L2 55 95 90 86 F 60 50 105 Power 110 115 40 120 35 125 130 135 140 C 30 Fluid Supply 100 Electric Micro-Boiler with Temperature Control STIEBEL ELTRON Mighty Might DFE Hydro-Shark 3 Electric Boilers Double Pole Breaker Double Pole Breaker Double Pole Breaker Electric Service Panel Boilers: Hydro Shark 3 - 07,10,12,14,19,24,29,36 NTC L1 L1 Ckt 2 L2 L1 Ckt 3 Fluid Return Power Light "Blinking" - Full Element Power. Power Light "Steady On" - Modulating Element Power Power Light "Off"- Element Power Off. Boiler Is Flow Activated Ckt 1 L2 L2 Wires sized for Load 240 Vac 2-Wire W/Gnd 3 Places 24 VAC T T Zone 1 J5 J6 C X X 1 X 2 ZC ZR SR504 Switching Relay COM BLK Integrator Panels: HSPS120MPL Zoning Panels: HS1T4ZPMP, HS2T4ZPMP N T T Zone 2 J5 Pre-wired Installed by others CP3S15-62FC Primary (Boiler) Circulator BLK This wiring diagram works with the following components: H N Zone 1 J6 C X 72 Deg BLK H N Zone 2 H N Zone 3 T T Zone 3 J6 C X Zone 4 Priority 16-2 W/gnd 120 Vac 16-2 W/gnd 120 Vac H N Zone 4 OFF ON N 16-2 W/gnd 120 Vac H N 16-2 W/gnd 120 Vac H J6 C X N H N H Zone1 CP3S15-62FC Zone 3 CP3S15-62FC 120 VOLT N H T T Zone 4 J5 72 Deg 72 Deg J5 Thermostat BLK 72 Deg WHT Thermostat GRN Thermostat BLK Zone 4 WHT Thermostat WHT Zone 3 BLK Zone 2 GRN Zone 1 WHT Wiring Diagram for Hydro-Shark 3 & Mighty Might 4-Zone by Pumps with TH135 Thermostats To Flow Sensor GRN Hydro Smart, Inc. 763-331-3066 [email protected] To Output Pipe Sensor WHT GR N H 14 GRN Zone 1 Zone 4 T'Stat Zone 3 T'Stat Zone 2 T'Stat T'Stat Power Cord 120 Vac Note: For Zone 4 priority Remove Jumper Between "P & "ZC" Terminals Zone2 CP3S15-62FC Zone 4 CP3S15-62FC Power 18-22 Awg 2-Wire 24 Vac 3 Plcs Operated by AA Batteries TH135 Thermostats Zoning By Zone Valves Primary/Secondary System 15 L1 100 55 50 105 Power 110 115 40 120 35 DFE NTC Ckt 1 L1 Ckt 2 L2 L1 Ckt 3 Boiler Is Flow Activated L2 Fluid Return Power Light "Blinking" - Full Element Power. Power Light "Steady On" - Modulating Element Power Power Light "Off"- Element Power Off. Fluid Supply 125 130 135 140 C 30 Electric Micro-Boiler with Temperature Control STIEBEL ELTRON 95 90 86 F 60 L2 16-2 w/gnd 120 Vac End Switch 24 VAC K BL W HT Operated by AA Batteries BLK CP3S15-62FC H N Secondary (Load) Circulator Primary (Boiler) Circulator L1 L2 T WH GR BLK N L1 Wires sized for Load 240 Vac 2-Wire W/Gnd 3 Places as needed per Boiler L2 L1 L2 Hydro-Shark 3 Electric Boilers Mighty Might Double Pole Breaker Double Pole Breaker Double Pole Breaker Electric Service Panel Zoning Panels: HS1T2ZZV, HS1T3ZZV, HS2T2ZZV, HS2T3ZZV, Boilers: Hydro-Shark 3-07,10,12,14,19,24,29,36 WHT CP3S15-62FC H N T 16-2 w/gnd 120 Vac Zone 1 T J6 T Zone 2 T J5 J6 C X Zone 1 End Switch Zone Valve Motor J9 Zone 2 ZVC 403 Valve Controller C X WHT WHT J5 BLU TH135 Thermostats YLW YLW HSPSMZL BLU N/O J10 Zone 3 End Switch Zone Valve Motor T Zone 3 Zone 3 T J5 End Switch 18- 22 Awg 4 Wire 24 Vac 4 Plcs Power Valve 3 T'Stat 3 Valve 2 T'Stat 2 Valve 1 T'Stat 1 18-22 Awg 2-Wire 24 Vac 3 Plcs Pre-wired Installed by others Zone Valve Motor J11 J6 C X 72 Deg RED RED BLK 72 Deg RED RED WHT Thermostat BLU 120 Vac/24 Vac 40 VA 72 Deg WHT WHT COM Thermostat YLW YLW N/C GRN Thermostat BLU Integrator Panels: GR N Zone 2 RED RED BLK WHT Zone 1 WHT WHT This wiring diagram works with the following components: To Flow Sensor BLU Wiring Diagram for Hydro-Shark 3 & Mighty Might 3-Zone by Valves with TH135 Thermostats To Output Pipe Sensor YLW YLW Hydro Smart, Inc. 763-331-3066 [email protected] BLU 16 L1 L2 L1 L2 55 95 90 86 F 60 100 50 105 Power 110 115 40 120 DFE NTC L1 Ckt 1 L2 L1 Ckt 2 L2 L1 Ckt 3 L2 Fluid Return Power Light "Blinking" - Full Element Power. Power Light "Steady On" - Modulating Element Power Power Light "Off"- Element Power Off. Boiler Is Flow Activated Fluid Supply 35 125 130 135 140 C 30 Electric Micro-Boiler with Temperature Control STIEBEL ELTRON Hydro-Shark 3 Electric Boilers Mighty Might Double Pole Breaker Double Pole Breaker L1 L2 Reset K BL W HT Mode COM T 16-2 w/gnd 120 Vac CP3S15-62FC H N Secondary (Load) Circulator 16-2 w/gnd 120 Vac End End Switch Switch Normal CP3S15-62FC H N Zone 1 T T T Zone 1 End Switch Zone Valve Motor J9 Zone 2 End Switch J6 ON OFF J11 End Switch Zone Valve Motor T Zone 4 T J5 Zone 4 Priority Zone 3 C X Zone 4 Pre-wired J6 C X J12 End Switch Note: For zone 4 priority move slide Switch to "ON" position 18- 22 Awg 4 Wire 24 Vac 4 Plcs Power Valve 4 T'Stat 4 Valve 3 T'Stat 3 Valve 2 T'Stat 2 Valve 1 T'Stat 1 18-22 Awg 2-Wire 24 Vac 4 Plcs Operated by AA Batteries TH135 Thermostats Zone Valve Motor Installed by others J10 Zone Valve Motor T Zone 3 J5 ZVC 404 Valve Controller Zone 2 T WHT WHT 24 VAC BLU Double Pole Breaker Wires sized for Load 240 Vac 2-Wire W/Gnd 3 Places as needed per Boiler YLW YLW Electric Service Panel BLU SH3-07,10,12,14,19,24,29,36 RED RED Boilers: J6 WHT WHT 120/24VAC 40VA C X BLU HS1T4ZZV, HS2T4ZZV RED RED J5 YLW YLW Zoning Panels: J6 BLU C X 72 Deg 72 Deg 72 Deg 72 Deg RED RED J5 Thermostat Thermostat Thermostat WHT WHT HSPS120MZL BLK Thermostat BLU Integrator Panels: WHT Zone 4 YLW YLW N/O Zone 3 BLU N/C GRN Zone 2 RED RED BLK WHT Zone 1 WHT WHT This wiring diagram works with the following components: To Flow Sensor BLU Wiring Diagram for Hydro Shark 3 & Mighty Might using 4-Zone by Valves with TH135 Thermostats To Output Pipe Sensor YLW YLW Hydro Smart, Inc. 763-331-3066 [email protected] BLU 17 Zoning by Telestat Primary/Seconday 18 55 95 90 86 F 60 100 50 105 Power 110 115 40 120 35 NTC L1 Ckt 1 L2 L1 Ckt 2 L2 L1 Ckt 3 L2 L1 DFE Boiler Is Flow Activated Fluid Supply Fluid Return Power Light "Blinking" - Full Element Power. Power Light "Steady On" - Modulating Element Power Power Light "Off"- Element Power Off. 16-2 w/gnd 120 Vac End Switch 24 VAC K BL W HT BLK CP3S15-62FC H N Secondary (Load) Circulator Primary (Boiler) Circulator GR BLK N L1 L2 T WH 125 130 135 140 C 30 Electric Micro-Boiler with Temperature Control STIEBEL ELTRON Mighty Might Wires sized for Load 240 Vac 2-Wire W/Gnd 3 Places as needed per Boiler L2 L1 L2 Hydro-Shark 3 Electric Boilers Double Pole Breaker Double Pole Breaker Double Pole Breaker Electric Service Panel Operated by AA Batteries CP3S15-62FC H N T J6 16-2 w/gnd 120 Vac Zone 1 T J5 T Zone 2 T J5 J6 C X Zone 1 End Switch J10 Zone 3 End Switch Telestat Motor T Zone 3 Zone 3 T J5 End Switch Telestat Motor J11 J6 C X 18- 22 Awg 4 Wire 24 Vac 4 Plcs Power Valve 3 T'Stat 3 Valve 2 T'Stat 2 Valve 1 T'Stat 1 18-22 Awg 2-Wire 24 Vac 3 Plcs Pre-wired Installed by others Note: More than 1 Telestat can be tied into each zone on the controller Telestat Motor J9 Zone 2 ZVC 403 Valve Controller WHT WHT Zoning Panels: HS1T2ZZV, HS1T3ZZV, HS2T2ZZV, HS2T3ZZV, Boilers: Hydro-Shark 3-07,10,12,14,19,24,29,36 C X BLU TH135 Thermostats YLW YLW HSPSMTL RED RED WHT 72 Deg BLU COM 72 Deg RED RED N/O 72 Deg WHT WHT BLK WHT Thermostat BLU 120 Vac/24 Vac 40 VA Thermostat YLW YLW N/C GRN Thermostat BLU Integrator Panels: GR N Zone 2 RED RED BLK WHT Zone 1 WHT WHT This wiring diagram works with the following components: To Flow Sensor BLU Wiring Diagram for Hydro-Shark 3 & Mighty Might 3-Zone by Telestats with TH135 Thermostats To Output Pipe Sensor YLW YLW Hydro Smart, Inc. 763-331-3066 [email protected] BLU 19 L1 L2 L1 L2 55 95 90 86 F 60 50 105 Power 110 115 40 120 35 125 130 135 140 C 30 Fluid Supply 100 Electric Micro-Boiler with Temperature Control STIEBEL ELTRON DFE Hydro-Shark 3 Electric Boilers Mighty Might Double Pole Breaker Double Pole Breaker L1 L2 NTC L1 L1 Ckt 2 L2 L1 Ckt 3 Fluid Return Power Light "Blinking" - Full Element Power. Power Light "Steady On" - Modulating Element Power Power Light "Off"- Element Power Off. Boiler Is Flow Activated Ckt 1 L2 L2 Normal Reset K BL W HT Mode COM T 16-2 w/gnd 120 Vac CP3S15-62FC H N Secondary (Load) Circulator 16-2 w/gnd 120 Vac End End Switch Switch 24 VAC CP3S15-62FC H N Zone 1 T T J6 T Zone 1 End Switch Zone 2 Motor J10 End Switch J6 Motor T Zone 4 T J5 J11 ON OFF Zone 4 Priority Zone 3 C X End Switch Zone 4 J6 C X Motor End Switch 18- 22 Awg 4 Wire 24 Vac 4 Plcs For zone 4 priority move slide Switch to "ON" position J12 Pre-wired Installed by others Power Valve 4 T'Stat 4 Valve 3 T'Stat 3 Valve 2 T'Stat 2 Valve 1 T'Stat 1 18-22 Awg 2-Wire 24 Vac 4 Plcs Operated by AA Batteries TH135 Thermostats Telestat Telestat Telestat Telestat Note: More than 1 Telestat can be tied into each zone on the controller Note: Motor J9 T Zone 3 ZVC 404 Valve Controller Zone 2 T WHT WHT Double Pole Breaker Wires sized for Load 240 Vac 2-Wire W/Gnd 3 Places as needed per Boiler BLU Electric Service Panel YLW YLW SH3-07,10,12,14,19,24,29,36 BLU Boilers: J6 RED RED J5 WHT WHT 120/24 VAC 40 VA J5 BLU HS1T4ZZV, HS2T4ZZV YLW YLW Zoning Panels: RED RED C X BLU J5 72 Deg 72 Deg 72 Deg 72 Deg RED RED C X Thermostat Thermostat Thermostat WHT WHT HSPS120MTL BLK Thermostat BLU Integrator Panels: WHT Zone 4 YLW YLW N/O Zone 3 BLU N/C GRN Zone 2 RED RED BLK WHT Zone 1 WHT WHT This wiring diagram works with the following components: To Flow Sensor BLU Wiring Diagram for Hydro Shark 3 & Mighty Might using 4-Zone by Telestats with TH135 Thermostats To Output Pipe Sensor YLW YLW Hydro Smart, Inc. 763-331-3066 [email protected] BLU 20 21 TROUBLE SHOOTING SYMPTOM POSSIBLE CAUSE SOLUTION NO HOT WATER • No Power • Safety thermal cut-off tripped • Not enough flow rate to activate unit • Plugged flow sensor • Utility Controlling Load • Reset Thermal cut-off • Wrong size Pump • Activate thermostat • Clean flow sensor WATER NOT HOT ENOUGH • Water flow too high • Voltage too low • Glycol/water ratio to high • Manifold or Ball Valve Closed • Reduce water flow rate • Supply correct voltage to unit • More than 20% less than 50% • Open Loops/Ball Valve LEDS DO NOT LIGHT • Problem with electronic controls • Call Tech Support 763-331-3066 22 FILLING THE SYSTEM OVERVIEW OF A TYPICAL SYSTEM E B A C E D When filling the system you need a “Fill Entry Point” (A) and a “Fill Exit Point” (B), 10 gallon bucket, 3 wash machine hoses (F) (6 Ft), 1/2 Hp “Transfer Pump” (D) and system fluids. When filling purge 1-loop at a time with the rest of the remaining loops closed. Use propylene glycol (not ethylene glycol - car antifreeze). Make sure “Purge Tee” (C) is in position shown. Close “Air Eliminator” (E) when purging and pressurizing. When purging one loop (2-3 minutes) at a time observe bubbles in bucket dissipating for removal of air. When all loops are purged free of air it is time to pressurize. With Transfer Pump (D) running close of “Fill Exit Point” (B) valve pressure will now rise. When pressure gauge shows 15-20 PSI close off “Fill Entry Point” (A). System is now purged in pressurized. For boiler operation rotate “Purge Tee” (C) to hoizontal position and rotate “Air Eliminator”(E) stem cap srew CCW 1 turn. ITEM D: 1/2 HP Transfer Pump P/N: 4850C (763-331-3066) 23 Boiler Pressure Drops Table (Boilers SH3-12 thru SH3-29) This table is used for sizing Primary (Boiler) Circulator All boilers must use Primary/Secondary circuitry. This is used to create Hydraulic seperation between the Boiler and Emitter circulators allowing you to create different flow rates for each circuit. 69 30 57.5 25 46 20 34.5 15 10 11.5 5 0 0 Flow Pressure (HD Feet) Flow Pressure (PSI) 23 SH3-29,36 SH3-8,10 SH3-14,19,24 SH3-12 0 .5 1 1.5 2 2.5 3 FLOW GPM 24 3.5 4 4.5 5 TH114-AF-024T Wiring To Taco ZVC404 Control Thermostat Thermostat Thermostat Thermostat 72 Deg 72 Deg 72 Deg 72 Deg W C WHT YLW RED RED WHT RED YLW R S WHT WHT RED WHT RED WHT C Floor Sensor Floor Sensor Floor Sensor Floor Sensor W R S YLW C WHT W RED R RED S YLW WHT RED C Load W Load Load Load R S MODE NORMAL RESET T T Zone 1 T T Zone 2 T T Zone 3 T T Zone 4 OFF ON Zone 1 Coil Zone 1 End Switch Zone 2 Coil Zone 2 End Switch Zone 3 Coil Zone 3 End Switch Zone 4 Coil Zone 4 End Switch ZONE 4 PRIORITY ZVC404 4-Zone (Zone Valve & Telestat Control) C W T R RED RED T T'Stat Zone 3 T'Stat Zone 2 Zone 3 72 Deg T RED RED T Zone 2 WHT R Floor Sensor C W WHT S R C Floor Sensor C W WHT WHT R RED RED Hydro Smart, Inc. 763-331-3066 T T Power SR503 3-Zone PumpRelay YLW W 24 V (T) Com Zone 1 (T) Floor Sensor Load R YLW S 72 Deg S W YLW Load YLW WHT 72 Deg S 72 Deg WHT RED Thermostat WHT Thermostat Floor Sensor Thermostat Load YLW TH114-AF-024T Wiring To Taco SR501 Control Load Thermostat Power TH114-AF-024T Wiring To Taco SR504 Control T'Stat Zone 1 Power 24 VAC COM 25 SR501 1-Zone Pump Relay T'Stat