Download APC InfraStruXure PDU Specifications

Transcript
System Operation
9. To apply power to the PDU distribution panel,
close (turn ON) the Q2 breaker on the PDU.
10.To apply power to the PDU power cables and connected equipment, close (turn ON) the
distribution panel breakers.
40
40kW InfraStruXure PDU—Operation and Configuration