Download AUTO ARC 255 Specifications
Transcript
2-5. Installing Work Clamp 1 2 Slide boot onto work cable. Route cable out front panel opening from inside. 4 3 Negative (–) Output Terminal Connect cable to terminal and cover connection with boot. 5 2 Work Cable Boot 4 5 Hardware Work Clamp Route cable through clamp handle and secure as shown. 1 Close door. Tools Needed: 3 1/2, 3/4 in ST-800 918-C 2-6. Installing Gas Supply 1 2 Cylinder Rack Chain Obtain gas cylinder and chain cylinder to rack. 3 4 5 Gas Hose Fitting CO2 Washer Regulator Install washer and regulator onto cylinder. 6 Gas Hose Connection Obtain gas hose with fittings and install between regulator and welding power source. 7 7 Flow Adjust Typical flow rate is 20 cfh (cubic feet per hour). 6 5 4 1 2 3 Tools Needed: 5/8, 1-1/8 in ST-154 623-A / Ref. ST-109 492 OM-157 066 Page 7