Transcript
Installation Set-Up
Installation Of Non-combustible Wall Board:
Install the non-combustible wall board provided with the unit. The side boards are interchangeable and are secured
with drywall screws, three (3) to each side of the unit and three (3) to each side frame member. The top board is
secured with four (4) drywall screws along the top frame (header), four (4) along the top nailing flange of the unit
and two (2) on each vertical frame member. Also secure the top wall board to the heat shield behind it with two (2)
screws and each drywall support upright with two (2) screws. See the section on hearth installation for installing
the hearth protector, required with the installation of this unit. All the screws required to attach the wall board sides
and top to the unit have corresponding holes already located on the units nailing flanges, drywall supports and heat
shield.
Figure 26: Installation of Wall Board