Download Clarke CPE130SS Technical data

Transcript
4.6.2 Three Phase Power Supplies
Enable
Signal
DHW time
clock
DHW
valve
Fault
Reverse
cycle
400Vac 50Hz Power
Supply
Fig 17 Heat pump
Wiring—Three Phase
Power Supplies
Heat Pump Wiring Terminal block
4.6.3 DHW time clock and 3 way diverting valve wiring
To/From Heating
Control System i.e.
Underfloor Control
Unit
Optional High Limit
DHW Stat
230 Vac 50Hz power supply
via a Type D MCB in the
buildings distribution Board
Fault
Reverse
cycle
Enable Signal links removed
Heat Pump Wiring Terminal block
Fig 18 Heat Pump Wiring—DHW
Note: The hot water cylinder high limit stat maybe required to be wired into the live return from the DHW
Heating Time Clock.
Note: If DHW option is enabled after commissioning and connection to DHW time clock, remove DHW
enable link.
20