Download Sharp R-408H Specifications
Transcript
TABLE OF CONTENTS SECTION A GENERAL INFORMATION A.1 Preface …………………………………………………………………………………………………….…………….… 1 A.2 Specifications …………………………………………………………………………………………………………..… 2 A.3 Receiving and Inspecting the Pump ……………………………………………………………………….… 3 SECTION B PUMP INSTALLATION B.1 Foundation and Baseplate Alignment ………………………………………..…………………….……… 4 B.2 Alignment ………………………………………………………………………………………………..…………….… 6 SECTION C PREPARATION FOR STARTUP C.1 Checking Rotation ……………………………………………………………………..……………………………… 6 C.2 Checking Impeller Clearance …………………………………………………………….……………………… 7 SECTION D PUMP STARTUP D.1 Starting the Pump ………………………………………………………………………………….………………… 7 D.2 Operating a Magnatex 3575 Pump at Reduced Capacity ............................................. 8 SECTION E PUMP DISASSEMBLY E.1 Recommended Spare Parts …………………………………………………….………………………………… 9 E.2 Required Tools ……………………………………………………………………………….…………….………… 10 E.3 Disassembly ………………………………………………………………………………………….………………… 10 SECTION PUMP ASSEMBLY F.1 Bearing Frame Assembly ……………………………………………………………….…………….…………… 12 F.2 Rotating Element Assembly ……………………………………………………………….………………..…… 12 SECTION G PUMP DRAWINGS G.1 Dimensional Drawing, Magnatex 3575 Series Pump …………………..………….……………… 14 G.2 Sectional Drawing, Magnatex 3575S …………………………………..…………….…………………… 15 G.3 Sectional Drawing, Magnatex 3575M ……………………………………………………….…………… 16 G.4 Sectional Drawing, Magnatex 3575L ………………………….……………………………..…………… 17 G.5 Exploded Drawing, Magnatex 3575S ………………………………..……………………….…………… 18 G.6 Exploded Drawing, Magnatex 3575M …………………………………….……………………………… 19 G.7 Exploded Drawing, Magnatex 3575L …………………………………………….………..……………… 20 SECTION H PUMP PARTS H.1 Modular Interchangeability ……………………………………………………………….…..……………… 21 H.2 Parts List and Materials of Construction …………………………………………………..…….……… 24 SECTION I MAINTENANCE, OPERATIONS AND REBUILD CHECKLIST I.1 Operations checks …………………………………………………………………….……………….…………….. 26 I.2 Impeller Clearance Settings ……………………………………………………………………………………… 27 I.3 Rebuild checks ……………………………………………………………………………….……………………... 29