2-34
12"
EXT.
ID
FAN
7.75
PIPE CHASE
SPLIT CLAMP
TRANSITION
PIECE
STEP 2
STEP 4
STORM
COLLAR
STEP 3
LD13326
3.On all outdoor Air Handling units the vent piping parts internal to the pipe chase will be factory mounted.
2.Outdoor Air Handling units over 102” high will have the external vent piping parts shipped loose for field mounting.
1.On outdoor Air Handling units the external flue/vent piping parts above the pipe chase are factory installed on units
having an overall height of less than 102”, including the vent piping.
NOTES:
0.43" CLEARANCE
6"L SLIP
JOINT
CONTAINMENT
BAND SET &
GASKET, 1" THK X 3"W X LG,
INSULATION FIBER
IVSI PIPE
(INSULATED PIPE)
CURB
PIECE
42"L VSI PIPE
(NOT INSULATED)
FLUE CAP
FIG. 2-52 – GAS FURNACE FUEL VENTING SYSTEM
5.50
HAT
CHANNEL
GAS FURNACE WITH CASING
SIDE
PANEL
RACEWAY
SPLIT PLATE
(Factory Installed)
STEP 1
Installation
FORM 102.20-N1 (1109)
johnson controls