Download ACV MCBA Specifications

Transcript
ENGLISH
FRANCAIS
NEDERLANDS
ESPAÑOL
ITALIANO
DEUTSCH
INDEX
WARNING
3
Who should read these instructions
Symbols
Recommendations
Applicable standards
Warnings
3
3
3
3
3
INTRODUCTION
4
Description of the specifications
4
USERS GUIDE
5
Directions for use
Settings the parameters
5
5
TECHNICAL CHARACTERISTICS
6
Natural gas categories
Propane gas categories
Pressure drop diagram of the boiler
7
7
7
ELECTRICAL CONNECTION
8
Wiring diagram
8
INSTALLATION INSTRUCTIONS
9
Dimensions
Boiler room
Wall mounting of the boiler
9
9
9
INSTALLATION
10
Connection to the chimney
Connection to the gas
Heating connections
Installation of simple heating circuit controlled by room thermostat ACV 15
Installation of simple heating circuit controlled by Room Unit
Installation of two heating circuits controlled by room thermostat ACV 15 and AM3-11 module
Installation of two heating circuits controlled by Room Unit and ZMC-1 module
Installation of three heating circuits controlled by Control Unit
Domestic hot water connection
10
11
11
12
13
14
16
18
19
COMMISSIONING AND MAINTENANCE
20
Commissioning the system
Inspection and maintenance
Disassembling the burner
Disassembling and checking the electrode
Disassembling the heat exchanger
Cleaning the heat exchanger
Temperature sensor resistance tables
20
20
21
21
21
21
21
MCBA PARAMETERS FOR THE SPECIALIST
22
Standby Mode
Settings the MCBA parameters
Request for information on the installation
Entering the code
MCBA parameters with code restricted access
Communication Mode
Error Mode
Safety stop + resolution of the fault
22
23
24
24
25
28
28
29
SPARE PARTS
664Y3000.A
See at the end of this manual
EN • 2