Download Evolution EVO2-50 Specifications
Transcript
LINKAGE REAR SUSPENSION To guarantee an optimal operation and the longest lifetime of the progressive linkage of the rear suspension, it is recommended to check after every race/run the correct tightening of the bolt. 45Nm 4 30Nm 45Nm To check the upper shock absorber fastening proceed as follow: Remove screws 1 and 2 (two per side). Remove the mudguard. 10Nm 2 At the end refit the screws 1 and 2. Tighten to the torque indicated. NOTE: It is recommended not to wash with water jets at high pressure in the zone of the linkage. 1 10Nm CHECKS AND MAINTENANCE Verify that the result of the suspension bolts to specified torque. Perform the check according to the times indicated in the table on page 59. To verify device, contact authorised Betamotor customer service. 51 GB