Download White 415 User guide
Transcript
Solid, Dry-lined, Stud Partition or Dry Partition Wall Structures 1. Before you decide on the final position of your shower control, please bear in mind the following : - Decide on a suitable position for the shower control. The position of the shower control and the shower fittings must provide a minimum gap of 25 mm between the spill-over level of the shower tray/bath and the handset. This is to prevent backsiphonage. Hose Retaining Ring 25 mm Minimum Spill-over Level - Determine whether the hot or cold water services will be connected to the shower control from the top (falling) or from the bottom (rising). 2. Remove the plastic building-in shroud. The two M5 x 50 mm building-in shroud retaining screws should be screwed temporarily into the base of the shower control for use later. 3. Familiarise yourself with the hot and cold water inlet ports and outlet port. They can be identified as follows: The Mira CombiForce 415B is supplied with inlet connections hot left, cold right and top outlet as standard. To change the position of the outlet refer to “Reversed Outlet Connection”: instructions 1. to 8. inclusive. 4. Determine the route for the incoming hot and cold water supply pipework. The outlet pipework to a flexible shower fitting is best positioned to emerge above and to one side of the shower control to allow the flexible hose to drape around the underside of the shower preventing the hose from interfering with the knob (refer to diagram). 21