Download Adaptive Engineering AXR Specifications
Transcript
- 12 - Operating Lift with Beech 1900 and Fairchild Metroliner Operators using either of these aircraft must note the following special instructions for these difficultto- access planes. In both cases, an experienced spotter must be positioned at the propeller to protect it from contacting the lift. Beech 1900 1. The Mobilift should be moved towards the aircraft in line with the door, and stopped when lift post A is 10 to 12 inches away from the spinner tip. 2. Spinner must not project inside of a line drawn from lift post A to lift post B. (If it does, it could be damaged by the handrail as the lift is raised.) See drawing below. 3. The bridge ramp will extend to cover the distance to the sill. When deploying the bridge ramp, bring it in above the support arms for the door cables until it sufficiently overlaps the sill and then lower it down. The spotter must watch ramp, spinner and air stair cables during this process. The cables may need to be held apart to allow the ramp to pass. Reverse this step by raising the ramp up clear of the support arms before retracting it. 12 Current Version Date: June 2011