Download TM 5-6115-465-34
Transcript
TM5-6115-465-34 TO35C2-3-446-2 NAVFAC P-8-625-34 TM06858B/06859D-34 Figure 5-24. Under Voltage Relay Test Circuit (b) Activate power source G1 and adjust . output voltage to 120 Vac at 50 Hz. (c) Activate power source G2. (d) Close switches S1 and S2. (e) Test lamp DS1 shall illuminate, and test lamp DS2 shall remain extinguished. (f) Vary output frequency of power source G1 from 50 to 450 Ha. There shall be no change in test lamp illumination. (g) Slowly decrease output voltage of power source G1 to l00 Vac. Vary output frequency from 350 to 450 Hz. Test lamp DS1 shall remain illuminated and test lamp DS2 shall remain extinguished. and test lamp DS2 shall illuminate. Set outputfrequency above 9S Vac ad mommtarily open switches S1 and allow relay to reset. (j) Repeat steps (i) for frequencies of 60, 70, and 100 Hz. (k) Set output frequency of power source G1 to 350 Hz. Slowly decrease output voltage to 90 Vet. DS1 shall extinguish end DS2 shall illuminate. Return output voltage to 120 Vac and momentarily open switch S1, allowing relay to re set. (l) Repeat step (k) for output frequency of 400 and 450 Hz. (9) Test under frequency relay as follow: (a) Install relay in test circuit shown in figure 5-25. (h)Slowly decrease output voltage of power source G1 to 95 Vat. Vary frequency from 50 to 100 Hz. DS1 shall reamain illuminated and DS2 shall remain extinguished. (b) Activate power source G1 and G2 and adjust output frequency to 50 Hz (400 Hz for 400 HZ units). (i) Set output frequency of power source G1 to 50 Hz. Slowly decrease output voltage of power source G1 to 90 Vac. Test lamp DS1 shall extinguish (c) Close switch S1. Test lamp DS1 small illuminate and DS2 shall remain extinguished. Change 4 5-35
Related documents
MTD 464 Operating instructions
Graco Inc. GMax 233700 User's Manual
MTD 21A-410-022 Operating instructions
MTD 114-112A Operating instructions
Protocol - Hussmann
MTD Series 465 Specifications
取扱説明書及び安全ガイドを必ずご参照下さい。 **2014 年 3 月 19 日
downloaded
"取扱説明書"
Environmental Compliance Assessment and Training
FM 5-472 Chapter 2 (Part 2 of 2)
Field Manual 5-484 Procedures for Well Drilling