Download Carrier 38BK-012 Specifications
Transcript
HAS PIPING SYSTEM BEEN EVACUATED TO 1000 MICRONS? HAS SYSTEM CHARGE BEEN WEIGHED IN (IF REQUIRED)? HAVE SERVICE VALVES BEEN FULLY BACKSEATED? CHECK VOLTAGE: OUTDOOR IS VOLTAGE WITHIN RANGE SHOWN FOR UNIT (WITH UNIT OPERATING)? INDOOR IV. START-UP IF UNIT HAS A CRANKCASE HEATER, HAS IT BEEN ON FOR 24 HOURS? MEASURE AND RECORD THE: F AIR ENTERING OUTDOOR UNIT: AIR ENTERING INDOOR UNIT: F F DISCHARGE LINE TEMPERATURE: VAPOR LINE TEMPERATURE: F MEASURE AND RECORD THE: VAPOR LINE PRESSURE: PSIG DISCHARGE PRESSURE: PSIG NOTES: Copyright 1999 Carrier Corporation Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations. Book 1 4 PC 111 Catalog No. 533-848 Printed in U.S.A. Form 38A,B/40Q-1SI Pg CL-2 5-99 Replaces: 53AN,BK-1SI Tab 3e 2f - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - CUT ALONG DOTTED LINE CUT ALONG DOTTED LINE START-UP CHECKLIST (cont)