Download Culligan Automatic Water Softeners Specifications
Transcript
Assembly Pin Brine Connection Meter Body Brine Connection Coupling Meter Body Interconnecting Pipe Bypass Figure 14. Bypass valve assembly. NOTE If the ground from the electrical panel or breaker box to the water meter or underground copper pipe is tied to the copper water lines and these lines are cut during installation of the bypass valve, an approved grounding strap must be used between the two lines that have been cut in order to maintain continuity. The length of the grounding strap will depend upon the number of units being installed. In all cases where metal pipe was originally used and is later interrupted by the bypass valve to maintain proper metallic pipe bonding, an approved ground clamp c/w not less than #6 copper conductor must be used for continuity. Check your local electrical code for the correct clamp and cable size. To bypass, turn the blue knob clockwise (see directional arrow on end of knob) until the knob stops as shown. DO NOT OVERTIGHTEN! (Figure 15). To return to service, turn the blue knob counterclockwise (see directional arrow on the end of knob) until the knob stops as shown. DO NOT OVERTIGHTEN! (Figure 16) About 1-1/4” A screwdriver shank may be used in the slot as a lever for extra turning force if needed. Figure 15. Turn blue bypass knob clockwise. Figure 16. Turn knob counter-clockwise. 01023052 23