Download ANCHOR

Transcript
Index
TABLE OF CONTENTS
Page No.
Assembly Step
2
3
4
5
6
7
9
10
11
12
13
14.
15
16
Squaring Footprint and Laying out Uprights
50’ NAVI-TRAC component list and Hardware Location Chart
Introduction
50’ NAVI-TRAC Component Illustrations
NAVI-TRAC Installation Safety Guidelines
Construct End Module Top Frame
Install Hip End Fabric
Installing Uprights Under the Top Frame
Tensioning and Guying Fabric
Constructing Hips for Rectangular Tents
Constructing Middle Bay Frame
Installing Mid Panels
Units with (2) or more Mid Bays and X-Cabling Requirements
50’ NAVI-TRAC Complete
16
FASTENING HARDWARE, GRAVITY PINS, LANYARD PINS & BOLTS
ILLUSTRATIONS:
2-T
2-B
3-T
3-B
4-T
4-B
5-T
7-T
7-B
8-T
8-B
9-T
10-T
10-B
11-T
12-T
12-B
13-T
13-B
14-T
14-B
15-T
15-B
16-T
SQUARING FOOTPRINT
POSITIONING UPRIGHTS
NAVI-TRAC COMPONENT LIST
FASTENING HARDWARE, GRAVITY PINS, LANYARD PINS & BOLTS
50’ NAVI-TRAC FRAME TERMINOLOGY
SQUARE TENT TOP FRAME
50’ NAVI-TRAC COMPONENT ILLUSTRATIONS
LAYOUT END MODULE COMPONENTS
CONSTRUCT FIRST BEAM
ASSEMBLING HIP END TOP FRAME
COMPLETING HIP END TOP FRAME
SQUARE UNIT TOP FRAME COMPLETE
LIFTING TOP FRAME (FIRST SIDE)
LIFT TOP FRAME (SECOND SIDE)
TENSIONING AND GUYING
HIP END MODULES FOR RECTANGULAR UNITS
COMPLETING THE HIP END
UNITS WITH (1) MIDDLE BAY
INSTALLING MID BAY PURLINS AND EAVE/ RIDGE BARS
PURLIN SUPPORTS IN 20’ MID BAYS
INSTALLING MID PANELS
UNITS WITH (2) OR MORE MID BAYS
X-CABLED BAYS
50’ NAVI-TRAC COMPLETE WITH FABRIC AND GUYING